My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07006
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:19 PM
Creation date
10/12/2006 2:02:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.300
Description
Wild and Scenic-Gunnison River
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1984
Author
UVWUA-Montrose Partn
Title
UVWUA FERC Application-Corres Reports etc 1984-Competing Application for License-Existing Dam-AB Lateral Hydropower Project
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />(\.. -' , :1 <br />o.J _ .: ,~IJ <br /> <br />. <br /> <br />. <br /> <br />minimal salinity increase. However, the other projects would divert <br /> <br />flows From the Gunnison River into the South Canal, which includes about <br /> <br />26,000 feet of unlined section. Thus, the competing projects have over <br /> <br />ten times the opportunity to increase the salinity of the water. <br />Additionally, the increased exposure to unlined canal sections will <br /> <br />result in a greater degradation of overall water quality. This will come <br />from the algal growth which occurs in the unlined canal sections, as well <br />as from the add it i on of suspended so 1 ids deri ved from bed and bank <br /> <br />erosion. <br /> <br />The increased exposure to unlined sections will also have the impact <br /> <br />of increasing the consumptive water use of the project. This ...ill occur <br /> <br />due to increased evaporation from the exposed water surface of the South <br /> <br />Canal, as well as increased <eepage through the unlined canal banks. <br /> <br />2. The AB Lateral project proposes the new construction of less <br /> <br />than three-quarters of a mi 1e of new transmission line, whereas the <br /> <br />competing projects propose the construction of approximately nine mi les <br /> <br />of new line. The additional construction is significnt in that it offers <br /> <br />the opportunity for increased imp.cts to the raptors of the region. <br /> <br />Raptor proofing wi 11 only decrease the chance of raptor electrocutions: <br /> <br />it wi 11 not el iminate it. Thus, in an area in which the bald eagle, an <br /> <br />endangered species, is known to frequent, raptor impacts are significant. <br /> <br />3. The AS Lateral project wi 11 result in enhanced fishery benefits <br /> <br />to the region, Because this proiect proposes to divert flows out of the <br /> <br />South Canal, it wi 11 allow the continued 'use of the South Canal during <br /> <br />the irrigation season as a fishery resource. Although this resource is <br /> <br />IS-i5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.