Laserfiche WebLink
<br />to:) <br />~ <br />o <br />.... <br /> <br />Exhibit 1 <br /> <br />MEASURES THAT COULD BE IMPLEMENTED <br /> <br />Measures <br /> <br />Product Water <br />Average Annual <br />KAF <br /> <br />A. Desalting Plants <br /> 1. We11ton-Mohawk drain east of Yuma <br /> (90 percent recovery) <br /> 15-Mga1/d complex 15 <br /> 30-Mga1/d complex 30 <br /> 60-Mgal/d complex 60 <br /> 120-Mgal/d complex 120 <br /> 200-Mga1/d complex 200 <br /> 2. Wel1ton-Mohawk drain west of Yuma <br /> (70 percent recovery) <br /> 35-Mgal/d complex 35 <br /> 70-Mga1/d complex 69 <br /> 105-Mga1/d complex 105 <br /> 140-Mgal/d comp1 ex 139 <br /> 3. Selective desalting of more saline <br /> Wel1ton-Mohawk wells, plus recycle 105 <br /> 4. Selective desalting of the more saline <br /> We11ton-Mohawk drainage and release <br /> to Colorado River 65 <br /> 5. Gulf of California 300 <br /> 6. California coast 300 <br /> 7. Lake Mohave 7,520 <br /> 8. Point sources - Palo Verde drain 405 <br /> 9. Geothermal brine (no estimate available) <br /> <br />B. Addition oJ Higher Quality Water for Substitution <br />of Well ton-Mohawk Return Flows <br />1. California water project (exchange for <br />Colorado River water) 220 <br />2. Yuma Mesa wells system 60 <br />3. Coachella Canal lining (California) 131 <br />4. All-American Canal lining (California) 78 <br />5. Substitution of higher-quality water <br />from above Imperial Dam <br /> <br />C. Changes in Operation Of the Well ton-Mohawk Division - <br />Gil a Project <br />1. Total shutdown of Wellton-Mohawk Division 0 <br />2. Partial shutdown of the Wellton-Mohawk <br />Division 0 <br />