Laserfiche WebLink
<br />, '~'.- ._~ r ..r-.~'-' ~ - , <br /> <br />< <br /> <br />to the matter, plus numerous repetitive responses and <br />suggestions, it appears that the process to date has covered the <br />full range of potential elements to be considered in subsequent <br />and more detailed formulation of EIS alternatives. However, if <br />necessary during the preparation of the draft EIS additional <br />alternatives can be added. <br /> <br />What'. Next <br /> <br />The next step is to report the findings to the cooperating <br />agencies at their next meeting. <br /> <br />The process of alternative formulation (diagrammed below) is <br />focused to meet the EIS needs for an appropriate range of <br />reasonable alternatives. The concept of a matrix to display <br />issues and elements of alternatives was noted at the work <br />session, and this idea will be pursued. <br /> <br /> AlkrlWlIV!!:> <br />~~.0t :Prel/llfl~ C.Ot'\~lk\'le-d <br />~e~~I'4 b~t :t d <br />Ser-eOl'~ Rosemable. 1: I"nl~ e <br />121~ A lierl)'ih~ 90.gs <br /> . . . . <br />a,ad. C f'l ter i a. Alfr~ftw? <br />4{kf7l~flvt) E-I?.. . J/Ip rilt ~l\a.l y,,:>ed <br />~ ~ed1l1( :7.. ~~J~ 't1:I:ai I <br /> ? f~ . <br /> Elel1'1el\ts <br /> <br /> <br /> <br />Further work will be accomplished to re-consider and clarify <br />objectives and scope, and this will be applied to the long list <br />of alternatives. In addition, the EIS team will carry out a <br />detailed screening process and refine the alternatives list for <br />further review, ultimately arriving at a "short list" of <br />alternatives with more detailed description. The No Action <br />alternative will be included in the "short list." <br /> <br />The EIS team will 'meet with Reclamation UC Region representatives <br />and others for review of the "short list" to obtain information <br />on specific operational characteristics. A report will be given <br />at a subsequent cooperating agencies meeting and feedback will be <br />obtained. <br /> <br />3 <br />