My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06922
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06922
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:56 PM
Creation date
10/12/2006 1:58:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
11/1/1971
Author
DOI-BOR
Title
Final Environmental Statement - Crystal Dam Reservoir and Powerplant - Curecanti Unit - Colorado River Storage Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OFf' ICE OF THE DIRECTOR <br /> <br />;; :j .c II ~ ;: <br /> <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />BUREAU OF MINES <br />WASf1INGTON. D.C, 20240 <br /> <br />September 22, 1971 <br /> <br />Memorandum <br /> <br />" <br /> <br />To <br /> <br />Direc tor, .BJrlreau of <br />Throug~~Jsistant <br /> <br />Director, Bureau of Mines <br /> <br />Reclamation <br />Secretary--Mineral <br /> <br />Resources ;J-L.. Jdr <br />Lell'ls 18. \'.,,!::I: <br /> <br />From <br /> <br />Subject: Bureau of Reclamation Draft Environmental Statement, <br />Crystal Dam, Reservoir, and Powerplant, Curecanti Unit, <br />Colorado River Storage Project <br /> <br />The draft environmental statement dated July 30, 1971, for construction <br />of Crystal Dam, Reservoir, and Powerplant of the Curecanti Unit, <br />Colorado River Storage Project, has been reviewed by Bureau of Mines <br />personnel. <br /> <br />A previous environmental statement that covered the impact of an <br />earthfill dam at the Crystal damsite was reviewed on February 23, 1971, <br />Economic and environmental factors now justify a change to a double- <br />curvature, thin-arch concrete dam, upon which the July 30 environmental <br />statement is based. <br /> <br />Environmental considerations are a commendable element in the Bureau <br />of Reclamation's plsn of development at the Crystal damsite, Several <br />negative environmental impacts related to the previously considered <br />massive earthfill dam are absent in the present plan for a thin concrete <br />dam. Unavoidable minor ecological impacts, therefore, are reduced, <br />whereas the numerous benefits from construction of Crystal Dam remain <br />in force and overshadow the environmental costs. <br /> <br />The Bureau of Mines made an onsite examination of the Curecanti Project <br />site in 1956 and found no significant mineral resources within the project <br />area. <br /> <br />We find the draft environmental statement adequately covers the <br />environmental impacts of the project. We take no exceptions to the <br />stated impacts and propose no alternatives to the project. <br /> <br />[7(C~~ <br />Director <br /> <br />2GG9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.