My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06918
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:55 PM
Creation date
10/12/2006 1:58:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1997
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1998 Work Plan Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LA <br /> <br />2, Develop easement agreements 10/97-9/98 <br />a. Contact owners of selected properties, <br />b, Identify needs/desires of landowners: determine if they <br />would be interested in some form of agreement, <br />c, Draft tentative agreement, <br />d, Obtain right to investigate (right-of-entry permit). <br />e. RIP and ESA authorization, <br />f. Screen for contaminants (Hazardous Waste Survey), <br />g, Determine floodability of site <br />h, NEPA compliance, <br />i, Conduct appraisals. <br />j. Solicitor review of draft agreement, <br />k. Negotiate and finalize agreement, <br />1. File easement; pay landowner <br /> <br />Note: 2.f. Contaminants. 2.0. Floodabilitv. and 2.h. NEPA. will be funded <br />from other Habitat Restoration Prooram components. <br /> <br />Following are time estimates (per site) for portions of the process: <br /> <br />-Appraisal process: 3-6 months <br />-Negotiation process: 1-3 months <br />-Title clearance, legal review, closing: 1-6 months <br /> <br />--------------------------------------------------- <br />--------------------------------------------------- <br /> <br />-Total: 5-15 months per site <br /> <br />IX, FY 98 Work <br /> <br />-Description of Work <br />See study methods/approach and task descriptions, above, <br /> <br />-Deliverables (due date) <br />Generic fee and easement agreements 12/97 <br />Landowner-specific draft agreements/easements 10/97-9/98 <br />Floodability reports 9/98 <br />Contaminants reports 9/98 <br />NEPA reports 9/98 <br />Appraisal reports 10/97-9/98 <br />Final agreements/easements 9/98 <br />Summary report of results 12/98 <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.