Laserfiche WebLink
<br />\4'<P <br /> <br />FY 99 Work <br /> <br />-Description of Work <br />See study methods/approach and task descriptions, above, <br />-Deliverables <br />Report - July 2000 <br />-Budget <br />$150K <br /> <br />IX. Budget Summary <br /> <br />FY 1998 $150K <br />FY 1999 $150K <br />Total: $300K <br /> <br />X, References <br /> <br />FLO Engineering. 1996. Green River flooded bottomlands investigation - Ouray <br />Wildlife Refuge and Canyonlands National Park. FLO Engineering, <br />Breckenridge, CO. 105 pp. + app, <br /> <br />FLO Engineering, 1997. Green River floodplain habitat restoration <br />investigation - Bureau of Land Management sites and Ouray National <br />Wildlife Refuge sites near Vernal, Utah - Final Draft, FLO Engineering, <br />Breckenridge, CO. 62 pp, + app, <br /> <br />6 <br />