My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06918
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:55 PM
Creation date
10/12/2006 1:58:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.A
Description
UCRBRIP Habitat Restoration
Basin
Colorado Mainstem
Date
10/8/1997
Author
UCRBRIP
Title
Final Habitat Restoration Program FY 1998 Work Plan Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~O <br /> <br />surface elevations, Analyses of these data yield topo maps, cross- <br />sectional profiles. stage-dlscharge relationships, and bankful flood <br />flow estimates (pre- and post-restoration), USGS data are analyzed <br />to determine flow magnitude. frequency. duration, and timing of <br />flooding both pre- and post-restoration, Baseline topo maps and <br />channel profiles also serve as a basis for post-restoration <br />comparison, <br /> <br />Design options are developed and overlain on site topos. Once the <br />preferred option has been selected, permits acquired. Section 7, <br />NEPA, Recovery Program approval, etc" the site is staked out to <br />show areas requiring grading, levee breaching, and spoils <br />deposition. Assistance and oversight is provided to equipment <br />,operators during site construction/excavation, <br /> <br />VII, Task Description and Schedule <br /> <br />Task 1, Reconnaissance surveys (Oct 199Z-Mar 199B) <br /> <br />Establish permanent monuments for main channel cross-sectional <br />profiles, hydraulic controls. water surface elevations. site <br />topography, bankful and levee elevations, <br /> <br />Task 2, Data collection (Oct 1997-Jul 1998) <br /> <br />Conduct channel cross-sectional profile surveys and topographic <br />surveys: collect stage-discharge data. <br /> <br />Task 3. Analyses (Oct 1997-Aug 1998) <br /> <br />Plot cross-sectional profiles and topo maps: develop stage-discharge <br />relationships, Conduct HEC-2 analyses: develop area-of-inundation <br />versus flow relationships: conduct hydrologic analyses, <br /> <br />Task 4, Configuration design (Oct 1997-Aug 1998) <br /> <br />Identify design options; advantages/disadvantages of each, <br /> <br />Task 5, Construction oversight (Oct 1997-Sept 1998) <br /> <br />Stake out areas of excavation: oversee construction, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.