My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06906
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:52 PM
Creation date
10/12/2006 1:57:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/3/1972
Author
USDOI
Title
Sixteenth Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />allocation <br />of federal <br />investment <br /> <br />t\ preliminary allocation of lotal <br />estimated costs for all authorized pro- <br />jects, including the provisionally <br />authorized Uintah Unit of the Central <br />Utah Projec!. is summarized in the table <br />on the righl. Allocations to the various <br />purposes authorized under Reclama- <br />lion Law are required by SL'Ction 6 of <br />Public Law 84-485, the Colorado River <br />Storage Project Act, excluding specific <br />Fish and Wildlife and Recreation <br />expenditures authorized by Section 8 <br />of this Act. Final allocation reports have <br />been prflpawd on the Florida. Paonia, <br />Silt and Smith Fork Projects - all olher <br />allocations are tentative. (See Exhibit B <br />in Appendix foraulhorized projeclsand <br />individual project costs by purpose <br />served.) <br /> <br />22 <br /> <br />ALLOCATION Of' ESTIMATED COSTS <br /> <br />Project Costs Allocated (Excludes Section 8 Costs) <br />Reimbursable Allocations: <br />Irrigation <br />Power <br />Municipal and Industrial Water <br />Other <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocation Costs, Public I.,I\\' H7-874 <br />Totlll <br /> <br />Other: <br />Navajo Indian Irrigation Projt-><;tl <br />Total Costs Allocated <br /> <br />Section 8 Costs: <br />Fish and Wildlife <br />Recreation <br />Tolal Costs Not Allocated <br /> <br />TOTAL <br /> <br />(l'houundl <br />olJ)oUuIJ <br /> <br />930,945 <br />685,583 <br />246,033 <br />3,089 <br />----- <br />1,865,650 <br /> <br />13,510 <br />1:15,354 <br />4,436 <br />4,949 <br />----w-8~249 <br /> <br />207,500 <br />-2-;-181,399- <br /> <br />37,310 <br />57,492 <br />-94;802 <br /> <br />2,276,201 <br /> <br />,Rf"I)(Iymf'nl of conslruclion cm;ls is subiecl 10 th,. Ad uf July I, 19J2 (47 Slu!. 51)41 <br /> <br />P"n",ol <br />011'01.1 <br />Alloulwln <br /> <br />42.6 <br />31.4 <br />11.3 <br />.2 <br />-as:s <br /> <br />.6 <br />4.0 <br />.2 <br />.2 <br />-5]) <br /> <br />9.5 <br />100.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.