My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06898
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8507
Description
Rio Grande and Tributaries NM
State
NM
Basin
Rio Grande
Date
4/5/1948
Author
Secretary of t Army
Title
Letter from Chief of Engineers Submitting a Report on a Preliminary Examination and Survey of Rio Grande and Tributaries, NM, Authorized by Flood Control Act Approved Aug 18, 1941
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />XII <br /> <br />LETTER OF TRANSMITTTAL <br /> <br />t. \.- ~ ~ , <br />l' <br /> <br />of the Department of the Interior, copies of your proposed report on a <br />preliminary "xamination and survey of thc Rio Grande and tributaries, <br />New Mexico, together with reports of the Board of Enginccrs for <br />Rivers and Harbors and of the district and division engineers, <br />Concurrent with the transmittal of your report. the proposed report <br />of the Secretary of the Int"rior on the middle Rio Grande project, <br />New Mexico, was transmittcd to the Secretary of the Army, to the <br />members of the Fcderal Inter-Agency River Basin Committee, and <br />to the affected States, including the State conservation officials of <br />New :M exico, for their views and recommendations. <br />The t.wo reoorts appear to be well coordinated on a comprehensive <br />plan of development for the middl" Rio Grande Basin and reflect <br />the high degr"e of coopern tion tho t obtained betweeTl the Department <br />of the Army, the Dcpnrtmcnt of tllC Intcrior, the Middlc Rio Grande <br />Conseryallcy District, the Rio Grande Compact Commission, the <br />affectcd Stutes. liBel other FC'dcl"nl find local interest.s in t.he. inycstigfl.- <br />tions and negotiations leading up to tbe formullltion of tbc plnn Oint <br />is set forth. <br />An analysis of your proposcd report indic"tes thnt the rcscrvoir <br />system, if opera ted Us proposed, would complement the irrigation and <br />sediment control nspccts with wllich the Blll'CHlI of Ret'huIllll.ion i~ <br />conc{lrned. However, because the protpetion and stnbilizntion of <br />agriculture find {'.conomic development in the middle Rio Grande <br />Valley require comprehensive treatment and cannot be achieved <br />by either the flood control or the reclamotion phase olone. it is eESCIl- <br />tia! that this point he made emincntly clenr in tIll, linn I reports of <br />both the Sccretary of the Army nne! the Sccretnry of the In tcrior, <br />The t.wo report.s. together cover an entire comprehensive plan which <br />should be undertn.kon in uccordunce \\'ith "joint agreement hetwp.en <br />the Secretary of the Interior find the Secretary of the Army on a <br />unifi(~d plan for control of floods, irrigntion, and use of water in the <br />middle Rio Grande Bl1sin in New !vIexico." dllicd July 25.19.17. <br />The reservoir capacities for flood control at Chiflo, Chamit.fi, nnd <br />Jemez, together with the design maximmn flow to bp, nllo\\'ed to poss <br />down the main chnnncl, were determined hy tbe Corps of Engineers. <br />In rpcognit,ion of the responsihility of the Corps of Engineer's for the <br />flood-control function to which thes" determinntions primarily relnte <br />in the reports ns prepared, the Bureau of Reclamation accepted the <br />decision of the Corps of Engineers in t,hcse matters. <br />No recolnnlendation is made for fluthorizution of power projects in <br />the proposed report,s of either agency, Howcver, powel' dcvelopment <br />at the Chiflo nnd Chamita sitcs mny ultimately become feasihle <br />through savings of wutel' or t,hrough importation of Colorndo River <br />water to the Rio Chllma, <br />It is esscntial, ns provided in the agrcement above referred to, t.hat <br />coor,dinnted reservoir operations be agreed upon by the Corps of <br />Englllccrs, Bureau of Reclamation, and the States of Colorado, New <br />I\t1exico, and Texas, to assure flood control and deliveries of woter in <br />full complinnce with the provisions of the Rio Grnnde compnct, <br />As "grced by the Sccretnl'Y of t./JC. Interior and the Secretnry of the <br />Army, the Burenu of Redamation should construct the channel <br />rectification works. The establishment of t.he linnl pllln would <br />properly he accomplished hy the Bureau of Reclamntion in coopera- <br />tion with the Corps of Engineers and wit.h such modification "s would <br />
The URL can be used to link to this page
Your browser does not support the video tag.