My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06855
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06855
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:39 PM
Creation date
10/12/2006 1:55:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
1/1/1993
Author
Ft Lyon Canal Compan
Title
Annual Report of The Officers of The Fort Lyon Canal Company
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 9 61SUPERlNTENDENT'S REPORT <br /> <br />We have completed the fiscal year of 1993 with completion of 35 runs of <br />water for a total of 234,531 acre feet in diversions. <br /> <br />We started the year with 48,082 acre feet in Adobe Creek Reservoir, there <br />was zero in Horse Creek Reservoir and 1,872 acre feet in Thurston Lake, <br /> <br />We had a year with many projects that we have compieted. We have <br />replaced numerous weir boxes and replaced several tubes in headgates on the <br />Main Canal. <br /> <br />We have cleaned many miles of ditch on the lower end of Lamar and on the <br />lower end of the Storage Canal. <br /> <br />The automatic headgate at Wasteway #1 in La Junta has helped to control <br />the water more satisfactorily to the benefit of the stockholders and the satisfac- <br />tion of the state, <br /> <br />The flapper gates installed at the lower dam have enabled us to control the <br />sand to a better degree. <br /> <br />We have installed rock jetty's on the north side of the canal east and west of <br />KC Bridge, <br /> <br />I have plans for extensive rock hauling in the La Junta and Horse Creek <br />Divisions and major headgate repairs in the Lamar and Limestone division with <br />extensive tree and sand removal on the Main Canal. <br /> <br />We have one special project this year. That is to install motors and gear <br />reductions on Wasteway #2 to enable a better sluicing program. <br /> <br />Thanks to the Stockhoiders, Directors, the Maintenance crew, Ditchriders and <br />to Janet and Amy for their support. <br /> <br />Respectfully submitted, <br />lena Smith, Superintendent <br /> <br />7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.