Laserfiche WebLink
<br />\P'- <br /> <br />TAHLE IV-2 WATER BUDGET ~OR ONFARM IRRIGATION <br />Mc ELMO CREEK SALINITY CONTROL STUDY, COLORADO <br /> <br />ITEM PRESENT 1/3tLTERNATIVE PLAN NUMHER <br /> 1-- 2 3 4 5 6 <br /> ------- ------ac. tt./yr.--------------- <br />Irrigation Supply 107,000 121,000 90,00e 84,000 85,00e 85,000 114,000 <br />Group Ditch Seepage 2,OUO 3,00U 3,OUU U l l 0 <br />Farm Velivery 105,OOU l1l:l,OOl l:l7,OOU l:l4,00U 85,OUU 85,OUU 114,OOU <br />Onfarm Ditch Seepage 2/ 4,000 4,00l 4,000 1,000 l,UUO 1,0Ol 0 <br />Seasonal Gross App. 101,UOO 114,OOl 83,000 83,000 84,OUO 84 , uoe 114,000 <br />Seasonal Net App. 1/ 47,OOU 54,OUO 54,00U 54,UOU 54,UUO 54,OUO 54,000 <br />Seasonal Deep Perc~ 2/ 9,000 IlJ ,OOl 7,000 7,000 7,000 7,000 10 ,000 <br />Seasonal Runoff 2/ - 26,000 <br /> 45,000 51,UOO 25,000 20,UOO 15,OUO 51,OUO <br /> - <br />Adequacy of Irrigation l:l7% 100% 1007. 100% 100% 10U% 100% <br />Efficiency of Irrigation 45% 45% 6U% 64% 64% 64% 47% <br /> <br />H <br /><: <br />I <br />00 <br /> <br />!/ Under present conditons the Hontezuma Valley Irrigation Company <br />experiences about a 13 percent shortage in its annual irrigation <br />requirements, ususally in late summer. The annual shortage wiLl be <br />alleviated with completion of the Dolores proj ect by the Ilureau of <br />Reclamation. <br /> <br />3../ Consumptive use by phreatophytic vegetation has not been separately <br />evaluated, however, it is recognized that runoff, deep percolation and ditch <br />seepage are primary sources of water for such vegetation, therefore, not all <br />of the runoff and seepage water indicated here will drain from the valley. <br /> <br />3/ Under Plan One seepage reductions are insignificant when rounding numbers <br />to closest I,UOO. <br /> <br />~ <br /> <br />o <br />C:' <br />\""'" <br />~ <br /><..-) <br /> <br />'-' <br />.'" <br />()) <br />'" <br />