Laserfiche WebLink
<br />MAY 1Q82 <br /> <br />TABLE 1-4 ANNUAL LEVELS OF FUNDING FOR IMPLEMENTATION <br />McELMO CREEK SALINITY CONTROL STUDY, COLORADO <br /> <br />Construction <br /> <br />Admi n. & 1/ <br />Technical- <br /> <br />Local <br /> <br />Total <br /> <br />Total <br /> <br />Total <br /> <br />Year Federa Local Assistance O&M 2/ Federal Local Cost <br /> ------- ------ ----------- ---$1,000 -------- --------- ---- <br />I 2,915 972 972 30.7 3,887 1,002.7 4,889.7 <br />2 2,915 972 972 61.4 3,887 1,033.4 4,920.4 <br />3 2,915 972 972 92.1 3,887 1,064.1 4,951.1 <br />4 2,915 972 973 122.8 3,888 1,094.8 4,982.8 <br />5 2,915 972 973 153.5 3,888 1,125.5 5,013.5 <br />6 2,915 972 973 184.2 3,888 1,156.2 5,044.2 <br />TOTAl 17,490 5,832 5,835 644.7 23,325 6,476.7 29,801.7 <br /> <br />1/ Includes $295,000 annually to continue the following: $100,000 for an <br />Irrigation Research Program by ARS, USDA; $45,000 for an Information and <br />Education Program by ES, USDA: and $150,000 for Monitoring and Evaluating <br />Kesu1ts by SCS, USDA. <br />2/ Annual level of funding for O&M during implementation period. Following <br />Implementation Annual O&M Cost will remain at about $185,000 <br /> <br />IMPLEMENTATION AUTHORITIES <br /> <br />There are three primary USDA authori ties through which onfann <br /> <br />improvements might be implemented. These are: <br /> <br />1. The Soil Conservation Act of 1935 (PL 46 - 74th Congress) <br /> <br />Under this authority and working mainly through local soil conservation <br /> <br />districts, the Soil Conservation Service (SCS) helps individuals, groups, <br /> <br />municipal and county officials, and planning bodies to cope with problems of <br /> <br />erosion, water supply and disposal, improper land use, flooding and <br /> <br />sedimentation. Assistance rendered by SCS ranges from advice and <br /> <br />consultation to on-site technical assistance for preparing conservation <br /> <br />plans; determining where conservation practices are practical and necessary; <br /> <br />designing, laying out, and supervising installation of the practices; and <br /> <br />1-6 <br /> <br />001823 <br /> <br />II. <br />