Laserfiche WebLink
<br />t <br />t <br />I <br />t <br /> <br />o <br />(""..) <br />...... <br />e.o <br />'"'"' <br />0') <br /> <br />( <br /> <br />~' <br />t <br />t <br /> <br /> <br /> <br />SUMMARY OF 1992 OPERATIONS <br /> <br />Water year. 1992 runoff was below average throughout the Colorado-Big <br />Thompson Ptoject (Project) varying from 59 percent of average for the <br />inflow intp Willow Creek Reservoir to 83 percent of average into <br />lake Granby. <br /> <br />Peak inflow~ to reservoirs within the Project occurred in late May with the <br />exception of the Big Thompson River above lake Estes which peaked on <br />June 26 at ~49 ft3/s. Inflow to Green Mountain Reservoir peaked on May 21 <br />at 1,753 fti/s. Inflow to lake Granby peaked at 1,954 ft3/s on May 27. <br />Inflow to W1110w Creek Reservoir peaked at 250 ft3/s on May 28. <br /> <br />River releases from Willow Creek Reservoir and lake Granby were made to meet <br />only minimum required releases for fish habitat. The maximum release at <br />lake Estes Was the minimum fish release of 125 ft3/s be~inning on May 16. <br />Project water del iveries peaked on May 6 at 638 ft /s at Horsetooth <br />Reservoir anp 510 ft3/s at Carter ~ake on July 14. The maximum release at <br />Green Mounta~n Reservoir was 792 ft /s on August 22, and the maximum project, <br />del iveryof 1400 ft /s to the Big Thompson River occurred on November 14, <br />1991. ' <br /> <br />Water year pr,eci pi tat i on totals for October-September vari ed from 88 percent <br />of average o~ the Green Mountain, lake Granby, and Willow creek watersheds <br />to 122 percent of average on the PoUdre watershed. <br /> <br />Winter precipitation (October-January) on the Project was much below <br />average at ~6 percent of average. Green Mountain Dam during October <br />received 0.531 inches of rain mixed with some snowfall, which was 48 percent <br />of average.' The lake Granby and Willow Creek watersheds received <br />2.06 inches of rain mixed with snowfall during October, which was <br />84 percent Of average. The lake Estes watershed received 0.57 inches of <br />rain mixed with snowfall, which was 64 percent of average. November <br />precipitationl was much above average over the Project with Project <br />precipitationistations reporting 136 percent of average. December was very <br />dry over the Project with some Project stations reporting zero <br />preCipitation: for December. The following individual precipitation <br />stations within the Project recorded very low amounts in December. <br /> <br />Individual PreciDitation Stations Within Project: <br /> <br />Station Amount Recorded. December 1991 (Inches) Rank in Yrs of Record <br /> <br />" <br /> <br />" <br />i! <br />I ~ <br />l' <br />i.. <br />I' <br />" <br />II <br />Ii; <br />1\; <br />I" <br />':1 <br />'; <br />':) <br /> <br />I! <br />:i: <br />I" <br />J: <br />:;: <br />1; <br />I <br />'I <br />I <br />" <br />'I <br />Ii; <br /> <br />All ens park <br />Breckenridge <br />Climax <br />Dillon <br />Estes Park <br />Flatrion <br />Gl6SSW <br />GllNW <br /> <br />.19 <br />.08 <br />.43 <br />.25 <br />.00 <br />.00 <br />.31 <br />.40 <br /> <br />3rd lowest in 47 years <br />lowest in 44 yrs <br />3td lowest in 42 yrs <br />4th lowest in 58 yrs <br />Tied for lowest in 83 yrs <br />Tied for lowest in 34 yrs <br />6th lowest in 44 yrs <br />4th lowest in 52 yrs <br /> <br />'j <br />I <br /> <br />1 <br /> <br />l <br />