My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06797
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06797
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:24 PM
Creation date
10/12/2006 1:52:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Platte Project
State
CO
Basin
South Platte
Water Division
1
Date
7/1/1966
Author
BoR
Title
Cache La Poudre4 Unit, Colorado Longs Peak Division Missouri River Basin Project Concluding Report July 1966
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Table 2,--Storable surplus flows <br /> <br />(1,000 ac,-ft.) <br /> <br />Year <br /> <br />Quantities derived from <br />Point flow analysis Water Commissioner study <br /> <br />1947 <br />1948 <br />1949 <br />1950 <br />1951 <br />1952 <br />1953 <br />1954 <br />1955 <br />1956 <br />1957 <br />1958 <br />1959 <br />1960 <br />1961 <br />Total <br />Average <br /> <br />47,2 <br />o <br />63,7 <br />o <br />2,4 <br />8.2 <br />o <br />o <br />o <br />7,5 <br />46,7 <br />62,6 <br />12,4 <br />0.3 <br />100,7 <br />351,7 <br />23.4 <br /> <br />. <br /> <br />54,1 <br />7,1 <br />69,0 <br />o <br />9.7 <br />16.3 <br />o <br />o <br />o <br />o <br />45,3 <br />118.6 <br />19.7 <br />7,6 <br />108,7 <br />452,1 <br />30.1 <br /> <br />Table 3,--Summary of C-BT delivery analysis <br /> <br />(1,000 ac.-ft,) <br /> <br />. <br /> <br />Historic <br />deli very <br /> <br />1947 0 <br />1948 0 <br />1949 0 <br />1950 0 <br />1951 0 <br />1952 21,2 <br />1953 106,9 <br />1954 157,3 <br />1955 108,6 <br />1956 81.0 <br />1957 80,4 <br />1958 136,9 <br />1959 112,6 <br />1960 100,2 <br />1961 60,0 <br />Total 965,1 <br />Average (15 yr.) b4,3 <br />* Assumes full operation of the C-BT project <br /> <br />Year <br /> <br />15 <br /> <br />Adjusted <br />deli veries* <br /> <br />59.9 <br />139,4 <br />59,9 <br />139,4 <br />61.6 <br />57,4 <br />102,2 <br />137,7 <br />135,2 <br />103.9 <br />80.4 <br />136.9 <br />112,6 <br />100.2 <br />60,0 <br />1486,7 <br />99,1 <br />throughout the <br /> <br />study period, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.