Laserfiche WebLink
<br />. <br /> <br />Estimated costs for the Cache la Poudre Unit follow, All costs <br />shown include contingencies and indirect costs: <br /> <br />Idvlwilde Dam and Reservoir <br /> <br />Lands and rights <br />Relocations of existing property <br />Clearing lands <br />Structures and improvements <br />Dam and dike <br />Dam and dike structure <br />Spillway <br />Outlet works <br />Auxiliary outlet works <br />Roads and bridges (access and service <br />roads to dam) <br /> <br />General Property <br /> <br />Total <br /> <br />CONSTRUCTION SCHEDULE <br /> <br />. <br /> <br />.$27,580,000 <br /> <br />$ 1,140,000 <br />3,970,000 <br />325,000 <br />120,000 <br />(21,885,000) <br />11,870,000 <br />5,230,000 <br />3,730,000 <br />1,055,000 <br /> <br />140,000 <br /> <br />100,000 <br />$27,680,000 <br /> <br />A construction schedule was not prepared for the Cache la <br />Poudre Unit. <br /> <br />12 <br /> <br />. <br /> <br />