Laserfiche WebLink
<br />c <br /> <br />- <br />~, . <br /> <br />r:: <br /> <br />c <br />""" <br />(":)) <br />"..:.... <br /> <br />~r:~~~ <br />"-.,..' <br /> <br /> <br />SECTION TITLE <br /> <br />PAGE <br /> <br />6,3 Equipment and Facilities <br />6,4 Land and Land Rights <br />6,5 Site Development <br />6,6 Working Capital <br />6.7 Indirect Capital <br />6,8 Interest During Construction <br />6,9 Transmission Facilities <br /> <br />53 <br />53 <br />53 <br />54 <br />54 <br />54 <br />55 <br /> <br />57 <br /> <br />57 <br />62 <br />62 <br />63 <br />63 <br />64 <br />69 <br />70 <br />70 <br /> <br />73 <br /> <br />73 <br />74 <br />74 <br />75 <br />79 <br />79 <br />82 <br /> <br />7 <br /> <br />NUCLEAR PLANT ANNUAL COSTS <br /> <br />7,1 Composition of Annual Costs <br />7,2 Operating and Maintenance Labor <br />7.3 General and Administrative Expense <br />7,4 Maintenance Materials and Supplies <br />7.5 Nuclear Insurance <br />7,6 Nuclear Fuel Costs <br />7,7 Cooling Water Costs <br />7,8 Transmission Maintenance <br />7,9 Amortization <br /> <br />8 <br /> <br />NUCLEAR PLANT REVENUES <br /> <br />8,1 Annual Gross Revenue Bases and Assumptions <br />8,2 Operating Revenue Assumptions <br />8,3 Commercial Power Sales <br />8,4 Net Revenues Peaking Load Plant <br />8,5 Net Revenues Base Load Plant <br />8,6 Mechanics of Calculations <br />8,7 Revenue Tables <br /> <br />9 <br /> <br />NUCLEAR PLANT PAYOUT <br /> <br />91 <br /> <br />91 <br />96 <br />97 <br />101 <br />102 <br /> <br />9,1 Mechanics of Calculations <br />9,2 Construction of Schedules <br />9,3 Analysis of Nuclear Alternatives <br />9,4 Sensitivity of Variables <br />9,5 Evaluation of Analysis <br /> <br />GLOSSARY <br /> <br />112 <br /> <br />LIST OF REFERENCES <br /> <br />115 <br /> <br />6 <br /> <br />The Ralph M. Parsons Company / Engineers. Constructors / Los Angeles. New York <br />