My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06794
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:24 PM
Creation date
10/12/2006 1:52:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.J
Description
Colorado River Basin Project
Basin
Colorado Mainstem
Date
7/20/1966
Title
Economic Analysis: Nuclear versus Hydroelectric Power Generation Colorado River Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0: <br />(;!', <br />c. <br /> <br />(~;., <br />-t/"') <br />.:.>- .~. <br />~'.':~ <br /> <br /> <br />CONTENTS <br /> <br />SECTION <br /> <br />TITLE <br /> <br />PAGE <br /> <br />ABSTRACT <br /> <br />2 <br /> <br />LIST OF PLATES <br /> <br />7 <br /> <br />7 <br /> <br />8 <br /> <br />LIST OF FIGURES <br /> <br />LIST OF TABLES <br /> <br />1 <br /> <br />OBJECTIVE <br /> <br />11 <br /> <br />2 <br /> <br />CONCLUSIONS <br /> <br />12 <br /> <br />3 <br /> <br />COLORADO RIVER BASIN PROJEm' <br /> <br />15 <br />15 <br />16 <br /> <br />3,1 Status or Legislation <br />3,2 Features or Bill <br /> <br />4 <br /> <br />THE ROLE OF HYDROELECTRIC AND THERMAL PCMER <br /> <br />19 <br /> <br />19 <br />19 <br />20 <br />21 <br />25 <br />27 <br /> <br />4,1 Power Requirements <br />4,2 Hydroelectric Sites <br />4,3 Northwest Hydroelectric Development <br />4,4 Central and Eastern Hydroelectric Development <br />4,5 Paciric Southwest Hydroelectric Development <br />4,6 Canyon Hydroelectric Plants <br /> <br />5 <br /> <br />NUCLEAR ALTERNATIVES <br /> <br />33 <br /> <br />5,1 Nuclear Plant Criteria 33 <br />5.2 Nuclear Power Plant Load-Following Characteristics 35 <br />5,3 Plant Location 41 <br />5,4 Water Requirements 42 <br />5,5 Nuclear Plant Alternatives 43 <br />5,6 Description or Hydroelectric Power Plant Complex 43 <br />5,7 Description or Nuclear Power Plant Complexes 45 <br />5,8 Transinission Facilities 48 <br /> <br />6 <br /> <br />NUCLEAR PLANT CAPITAL COSTS <br /> <br />50 <br /> <br />50 <br />50 <br /> <br />6,1 Basis or Costs <br />6,2 Composition of Capital Costs <br /> <br />5 <br /> <br />The Ralph M. Parsons Company / Engineers. Constructors / Los Angeles. New York <br />
The URL can be used to link to this page
Your browser does not support the video tag.