My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06790
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:22 PM
Creation date
10/12/2006 1:52:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Reports
Basin
Colorado Mainstem
Date
1/1/1999
Author
UCRBRIP
Title
1998 Annual Reports Package (incomplete) Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />meetings, Policy and legal work continued on Case Numbers 5-95CW296 and 5- <br />95CW297 in the Colorado River, <br /> <br />In order to perfect the water rights that the CWCB appropriated in 1995, the staff <br />continues to actively participate in the Yampa River Management Team (see Annual <br />Report for Project Number Cap 9a), Policy and legal work continued on Case Numbers <br />6-95CW155 and 6-95CW156 in the Yampa River, <br /> <br />All of the tasks identified above in Item V,A and V,B, have been completed except for all <br />activities on the Colorado River from Rifle to the Roller Dam and the Roller Dam to the <br />15 Mile Reach, as these flow recommendations have not yet been identified by the FWS, <br />Legal activities continued on Case #'s 95CW296, 95CW297, 95CWJ55 and 95CWI56, <br />Scientific evaluations of flow recommendations for the Little Snake and White rivers were <br />not conducted as these recommendations have not yet been developed by the FWS, <br /> <br />IV, Study Schedule: <br /> <br />Investigations regarding instream flow issues and the Recovery Program have been <br />ongoing since 1989, and are expected to continue through the life of the Program, <br />Administrative, policy, legal and institutional issues continue to be addressed through <br />reviews and meetings regarding further refinement of the biological and hydrologic <br />portions of the flow recommendations, <br /> <br />V. Relationship to RIPRAP: <br /> <br />Colorado River Mainstem Activity Item Numbers: <br />I.A,2,a(l) Review scientific basis Rifle to Roller Dam <br />I.A,2,a( 4) Preliminary notice ofbi-level acceptance, dependent on flow rec's <br />I.A,2,b(l) Review scientific basis Roller Dam to IS-Mile Reach <br />I.A,2,b,(4) Preliminary notice ofbi-Ievel acceptance <br />I.A.3,a(2)(a) CWCB action to advance preliminary to final notice <br />I.A.3,a(2)(b) CWCB filing <br />I.A.3,b,(2)(a) CWCB action to advance preliminary notice to final <br />I.A,3,b,(2)(b) CWCB filing <br />I.B,2,a Review scientific basis Gunnison to Stateline, dependent on flow <br />recommendations by the FWS <br />Remaining litigation dependent items <br /> <br />Yampa River Activity Item Numbers: <br />I.B,4, Legally protect flows <br /> <br />Gunnison River Activity Item Numbers: <br />I.B,J Review scientific basis <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.