My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06790
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:22 PM
Creation date
10/12/2006 1:52:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Reports
Basin
Colorado Mainstem
Date
1/1/1999
Author
UCRBRIP
Title
1998 Annual Reports Package (incomplete) Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 98 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: 54 <br /> <br />I, Project Title: ASPINALL STUDY-Synthesis of studies conducted for the <br />Biological Opinion on the operation of the Aspinall Unit. <br /> <br />II, Principal Investigator(s): <br /> <br />Frank K, Pfeifer, Project Leader <br />Charles W, McAda, Fishery Biologist <br /> <br />764 Horizon Drive, South Annex A <br />Grand Junction, Colorado 81506 <br />(970) 245-93 I 9: Fax 245-6933 <br />Frank_Pfeifer@FWS,GOV <br />Chuck_McAda@FWS,GOV <br /> <br />Ill. Project Summary: <br /> <br />Fifteen related studies have been conducted to provide data to be used in the <br />Biological Opinion on the operation of the Aspinall Unit. In addition, many other <br />studies have been, or are being conducted in various parts of the Upper Colorado <br />River Basin thai will be useful to the Biological Opinion Process, <br /> <br />This scope of work is intended to consolidate the information currently being <br />collected throughout the Gunnison and Colorado rivers that is directed toward the <br />Aspinall Biological Opinion, It will make flow recommendations to operate the <br />Aspinall Unit in a way that will benefit the endangered fishes of the Colorado River. <br /> <br />IV, Study Schedule: Behind Schedule, Draft Final Report in March 1999 <br /> <br />V, Relationship to RlPRAP: Colorado River Action Plan: Gunnison River: <br />l.A, Initially identifY year-round flows needed for recovery; and V,A, Conduct <br />research to acquire life history information and enhance scientific techniques required <br />to complete recovery actions, <br /> <br />Vl. Accomplishment of FY 98 Tasks and DeIiverables, Discussion of Initial Findings and <br />Shortcomings: <br /> <br />Work has continued on the Synthesis Report, but it is behind schedule, Most efforts <br />have gone to completing reports by the individual researchers that need to be <br />completed before the Synthesis Report can be completed, Draft reports that will form <br />important components of the synthesis report are now in various stages of review, An <br />important report describing the hydrology and geomorphology of the Gunnison River <br />has been submitted to the Biology Committee for review, Data presented in that <br /> <br />54-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.