My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06790
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:22 PM
Creation date
10/12/2006 1:52:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Reports
Basin
Colorado Mainstem
Date
1/1/1999
Author
UCRBRIP
Title
1998 Annual Reports Package (incomplete) Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IV, Study Schedule: Proposed revised schedule for completion of Flaming Integration <br />Report, <br /> <br />'December 1, 1998 - Requested deadline for comments from peer reviewers on draft <br />integrated report, <br /> <br />'January I, 1999 - Revised draft final report submitted to Recovery Program for <br />Biology Committee review, (dependent on receipt of all peer reviewers comments by <br />December 1) <br /> <br />, July I, 1999 - Anticipated date for final report, Actual date may vary dependent on <br />turnaround time of Biology Committee review and nature and magnitude of <br />suggested revisions to the document. <br /> <br />V, Relationship to RIPRAP: Tbis,project specifically addresses flow recommendations <br />within the Green River Action Plan, these include: <br />LA.! ,b Identify flows needed for the winter/spring, and <br />LA,!.c Review summer/fall flow recommendations, <br /> <br />VI. Accomplishment ofFY 98 Tasks and Deliverables, Discussion ofInitial Findings <br />and Shortcomings: <br /> <br />Accomplishments during FY 98 and early FY 99 include: <br /> <br />. The draft integrated report was submitted to a panel of six peer reviewers on <br />October 8, 1998 (the peer review panel included Dr. LeRoy Poff, Dr. Harold Tyus, <br />Dr, Jack Stanford, Dr, Dan Beyers, Dr, Ned Andrews and Dr, David Propst), <br /> <br />'Regular meetings of the Technical Integration Team were conducted and <br />workshops with Principal Investigators was held on November 10, 1997 and July 28, <br />1998, The purpose of the November workshop was to discuss research findings and <br />to formulate preliminary flow needs for Colorado pikeminnow (formerly Colorado <br />squawfish), razorback sucker, humpback chub and the riverine habitats required by <br />the target species, Based on the species and resource specific relationships, <br />preliminary integrated flow recommendations were developed and incorporated into <br />a draft report, A second workshop was held in July 1998 to review and discuss the <br />preliminary draft report with the principal field investigators, Results of this <br />workshop were incorporated into a revised draft that was submitted for peer review <br />in early October 1998, <br /> <br />No attempt to discuss initial findings will be made at this time since the draft report <br />will shortly be available to the Program (January 1999), <br /> <br />Submission of a draft report to the Recovery Program has been delayed for a variety <br />of reasons which include: delays in the finalization of individual reports, the need to <br />incorporate results of the July 1998 workshop in the draft document, late peer review <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.