Laserfiche WebLink
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 98 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: 53 <br /> <br />I. Project Title: Flaming Gorge Flow Recommendation Investigation: Technical <br />Integration and Final Report <br /> <br />II. Principal Investigator(s): <br />Larry Crist <br />U,S, Bureau of Reclamation <br />125 S, State Street <br />Salt Lake City, UT 84138 <br />(801) 524-3639 <br /> <br />Robert Muth <br />U,S, Fish and Wildlife Service <br />145 East 1300 South <br />Salt Lake City, UT 84115 <br />(801) 524-5001 ext 130 <br /> <br />Kevin Bestgen <br />Dept. Fishery and Wildlife Biology <br />Colorado State University <br />Fort Collins, CO 80523 <br /> <br />John Hayse/Kirk LaGory <br />Argonne National Laboratory <br />9700 S, Cass <br />Argonne, III 60439 <br />(708) 252-7949 <br /> <br />Leo Lentsch <br />Utah Wildlife Resources <br />1596 West North Temple <br />Salt Lake City, Utah 84116 <br />(801) 538-4756 <br /> <br />III, Project Summary: The purpose of the project is to synthesize and consolidate <br />biological and physical information from the Flaming Gorge Research Program and <br />prepare the final Integrated Report that will provide flow recommendations and form <br />the scientific base for the revised Biological Opinion on operation of Flaming Gorge <br />Dam, During FY 1998 the following tasks were initiated or completed: a) revised <br />drafts of reports for projects conducted under the Flaming Research Program were <br />provided to the Technical Integration Team; 2) the Technical Integration Team <br />conducted two workshops with researchers; 3) a peer review panel was selected and <br />approved by the Program Director's office; and 4) a revised schedule for completion <br />of the final Integrated Report and Flaming Gorge Biological Opinion was developed, <br />