My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06790
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:22 PM
Creation date
10/12/2006 1:52:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Reports
Basin
Colorado Mainstem
Date
1/1/1999
Author
UCRBRIP
Title
1998 Annual Reports Package (incomplete) Part 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 98 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: 53 <br /> <br />I. Project Title: Flaming Gorge Flow Recommendation Investigation: Technical <br />Integration and Final Report <br /> <br />II. Principal Investigator(s): <br />Larry Crist <br />U,S, Bureau of Reclamation <br />125 S, State Street <br />Salt Lake City, UT 84138 <br />(801) 524-3639 <br /> <br />Robert Muth <br />U,S, Fish and Wildlife Service <br />145 East 1300 South <br />Salt Lake City, UT 84115 <br />(801) 524-5001 ext 130 <br /> <br />Kevin Bestgen <br />Dept. Fishery and Wildlife Biology <br />Colorado State University <br />Fort Collins, CO 80523 <br /> <br />John Hayse/Kirk LaGory <br />Argonne National Laboratory <br />9700 S, Cass <br />Argonne, III 60439 <br />(708) 252-7949 <br /> <br />Leo Lentsch <br />Utah Wildlife Resources <br />1596 West North Temple <br />Salt Lake City, Utah 84116 <br />(801) 538-4756 <br /> <br />III, Project Summary: The purpose of the project is to synthesize and consolidate <br />biological and physical information from the Flaming Gorge Research Program and <br />prepare the final Integrated Report that will provide flow recommendations and form <br />the scientific base for the revised Biological Opinion on operation of Flaming Gorge <br />Dam, During FY 1998 the following tasks were initiated or completed: a) revised <br />drafts of reports for projects conducted under the Flaming Research Program were <br />provided to the Technical Integration Team; 2) the Technical Integration Team <br />conducted two workshops with researchers; 3) a peer review panel was selected and <br />approved by the Program Director's office; and 4) a revised schedule for completion <br />of the final Integrated Report and Flaming Gorge Biological Opinion was developed, <br />
The URL can be used to link to this page
Your browser does not support the video tag.