My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06770
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:10:57 PM
Creation date
10/12/2006 1:51:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
4/19/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.>' <br /> <br />. <br /> <br />. <br /> <br />00 i 0~ J <br /> <br />The proposed feosibility report for the DALLAS CREEK PROJECT is being <br /> <br />processed. We anticipate that distribution will be made this month to Federal, State, <br /> <br />and local agencies for informal review. <br /> <br />On the WEST DIVIDE PROJECT, feasibility designs and estimates are being <br /> <br />"- <br />completed on remaining project features. Work is continuing on appendixes for pro- <br /> <br />posed feasibility report. The report is scheduled to be completed in the fall of this <br /> <br />year. <br /> <br />Preparation of design data, feasibility designs, and estimates, and water supply <br /> <br />operation studies are in progress on a modified SAN !MIGUEL PROJECT plan. A <br /> <br />report is scheduled for completion early in F. Y. 1966. The report will generally be <br /> <br />unfavorable except for the Miramonte Reservoir segment wh ich appears to be an econ- <br /> <br />omically justified development for municipal and industrial water, fish and wildlife, <br /> <br />and recreation uses. <br /> <br />Plan formulation studies, water supply studies, and agricultural economic studies <br /> <br />are in progress on the BATTLEMENT MESA PROJECT. We are involved at the present <br /> <br />time in supplemental analysis of lands in the upper Buzzard Creek area to determine <br /> <br />land acreages that can be reclassified from class 4 to class 3 and thus qualify for service <br /> <br />by the project. A proposed feasibility report is scheduled for completion in F. Y. 1966. <br /> <br />Land classification field work and collection of basic water supply data have <br /> <br />been completed on the BLUESTONE PROJECT. We are now tabulating acreages and <br /> <br />initiating plan formulation studies to select the project plan for the proposed feasibil- <br /> <br />ity report, scheduled for completion in F. Y. 1967. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.