My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />cr-; <br />, <br />'-0" <br />~ <br />C. <br />..J <br /> <br />. <br /> <br />. <br /> <br />(3) Seasoning and Testing Period <br /> <br />After construction is completed, but before the facilities <br /> <br />are transferred to the GVIC to operate and maintain, a seasoning <br /> <br />and testing period will be provided. <br /> <br />Reclamation proposes <br /> <br />that GVIC operate and maintain the facilities during this period <br /> <br />before GVIC agrees to accept responsibility for O&M. Reclamation <br /> <br />will provide adequate funds in advance to GVIC for this work. <br /> <br />The purpose of this period is to insure that the improved lateral <br /> <br />is operating properly and that most construction deficiencies <br /> <br />are corrected. <br /> <br />(4) Transfer of Facilities <br /> <br />After <br /> <br />completing <br /> <br />construction <br /> <br />of <br /> <br />the <br /> <br />improved <br /> <br />lateral::>, <br /> <br />inspection will be made by GVIC, lateral users reprel::lentative, <br /> <br />and Reclamation to determine what deficiencies if any exist <br /> <br />and to agree on a course of action to correct them. When the <br /> <br />deficiencies have been defined, the corrective action program <br /> <br />agreed upon, and the seasoning and testing period completed, <br /> <br />Reclamation will provide written notice and GVIC will accept <br /> <br />the care, operation, and maintenance responsibility of the <br /> <br />lateral improvements. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.