My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C) <br />c: <br />c: <br /> <br />. <br /> <br />. <br /> <br />.~ <br /> <br />Reclamation and GVIC do not wish to use condemnation to acquire <br /> <br />( <br /> <br />'.:.1 <br /> <br />easements. <br /> <br />If a lateral has a majority of the stockholders <br /> <br />who want <br /> <br />to participate <br /> <br />but <br /> <br />cannot <br /> <br />obtain <br /> <br />100 percent <br /> <br />participation on a voluntary basis; Reclamation proposes that: <br /> <br />(1) Lateral incorporate with the intent of participating <br /> <br />in the improvement program. <br /> <br />(2) Lateral corporations initiate condemnation procedures. <br /> <br />When Reclamation completes the lateral improvements of all <br /> <br />the 100 percent participating laterals in the valley, it will <br /> <br />ask the State of Colorado if they wish to have additional <br /> <br />laterals included in the program. <br /> <br />At that time, condemnation <br /> <br />will be considered if the condemnation expenses on the lateral, <br /> <br />along with construction costs, do not caUSE: the total costs <br /> <br />to exceed the current cost effectiveness ceiling. <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.