My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06701
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:58 PM
Creation date
10/12/2006 1:49:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.A
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1975
Author
CWCB
Title
West Divide Project - March 1975
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />".Jill <br />';~'Y <br /> <br />development of an oil shale industry materializes, additional water <br />could be made available from the project for municipal and industrial <br />(.0 use through retirement of the irrigated lands. <br />;." <br />~ Other alternatives that should receive serious consideration are <br />(.J changing the proposed surface irrigation to sprinklers, and the possible <br />reduction of the irrigated lands, particularly new lands. Consideration <br />will also be given to alternative reservoir sites for Placita, Yank <br />Creek and Haystack. <br /> <br />The physical location, the project needs and the national priorities <br />lend themselves to a stage development for the project. Only the <br />immediate West Divide area could be constructed initially for presently <br />irrigated lands and to furnish a local municipal and industrial water <br />supply. If more urgent, the Fourmile Creek area could be developed <br />initially. Any number of combinations could be developed to meet the <br />immediate needs of the nation, region and local area. <br /> <br />Estimated Costs (October, 1967 prices) <br /> <br />Municipal and industrial water <br />Irrigation <br />Fish and wildlife <br />Flood control <br /> <br />Total Cost <br /> <br />$ 30,701,000 <br />74,280,000 <br />1,319,000 <br />280,000 <br />$106,580,000 <br /> <br />Water allocation <br /> <br />Municipal and industrial <br />Irrigation <br /> <br />Total <br /> <br />77,500 a.f. <br />115,600 a.f. <br />193,100 a.f. <br />76,400 a.f. <br /> <br />Annual depletion of the Colorado River <br /> <br />Estimated annual salinity concentration <br />at Imperial Dam <br /> <br />Benefit-cost ratio <br /> <br />Undetermined <br /> <br />Total annual benefits <br /> <br />1.80 to 1 <br />$ 7,481,000 <br /> <br />Environmental Impact <br /> <br />Depending upon the start of oil shale production, the greatest <br />effect would be the social and economic changes caused by an influx or <br />people to the area. Urbanization would take place where small rural <br />communities or no communities now exist. <br /> <br />Advance plans are being considered for an alternative storage site <br />to replace Placita Reservoir on the Crystal River in order to reduce <br />the environmental impact of this main feature of the project. Plans are <br />also being considered to reduce the impact of irrigation on new lands by <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.