My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06701
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:58 PM
Creation date
10/12/2006 1:49:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.A
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1975
Author
CWCB
Title
West Divide Project - March 1975
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,.., <br />,/' .~ <br />~ <br />c\Z <br /> <br />(;~,' <br />"~TJ <br /> <br />;."?~ <br /> <br />COLORADO WATER CONSERVATION BOARD <br />102 Columbine Building <br />1845 Sherman Street <br />Denver, Colorado 80203 <br /> <br />March, 1975 <br /> <br />WEST DIVIDE PROJECT <br /> <br />The West Divide project lies in parts of Garfield, Mesa and Pitkin <br />counties in west-central Colorado. Specifically, the majority of the <br />project lands lie between Glenwood and DeBeque on the mesas south of <br />the Colorado River. Most of the municipal and industrial service area <br />is the towns and oil shale areas along the Colorado River Valley at <br />the base of the Roan Plateau which contains some of the world's richest <br />011 shale deposits. The eastern portion extends to the town of Carbon- <br />dale, the center of some coal mining activities in the nearby canyons. <br /> <br />The project was authorized by the Congress in 1968 as a partici- <br />pating project of the Colorado River Storage Project. The West Divide <br />Water Conservancy District was organized in 1964 as the sponsoring and <br />contractual agency for the project. This district includes portions of <br />Garfield, Mesa and Pitkin counties. <br /> <br />Plan of Development (Feasibility Report) <br /> <br />The West Divide project is planned to provide water for irrigation <br />and for municipal and industrial use in connection with development of <br />natural resources in the area. It also would provide benefits to rec- <br />reation, fish and wildlife and flood control. <br /> <br />Project water would be obtained from a series of Colorado River <br />tributaries south of the river. Crystal River flows would be regulated <br />at Placita Reservoir. Some reservoir releases would be made directly <br />to the river for downstream uses. Most of the releases, however, would <br />be diverted into the Huntsman Canal and conveyed westward to West <br />Divide Creek for subsequent distribution in the western portion of the <br />project area by the East and West Divide Canals. The diverted flows <br />would be supplemented by water stored in Haystack Reservoir on small <br />tributaries of West Divide Creek. Natural flows at Haystack Reservoir <br />would be augmented by flows of nearby streams diverted by feeder canal. <br />Yank Creek Reservoir would be constructed on North Thompson Creek to <br />meet project needs in the eastern portion of the project area. Releases <br />from this reservoir would be distributed by the Fourmile Canal. Irri- <br />gation laterals would be constructed from the main project canals, and <br />drains would be provided as needed. Municipal and industrial water <br />would be made available for use in the area. Facilities for reregula- <br />tion, distribution, and treatment of the municipal and industrial supply <br />would be the responsibility of the water users. Recreational develop- <br />ments would be provided by the Forest Service at all project reservoirs <br />since the reservoirs would be within national forest boundaries. <br /> <br />The present plan for the project has evolved from studies of <br />numerous alternatives as the most desirable development to meet water <br />needs of the project area anticipated for the near future. If <br />
The URL can be used to link to this page
Your browser does not support the video tag.