My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06675
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:51 PM
Creation date
10/12/2006 1:47:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8102
Description
Arkansas River Basin Basic Hydrology
State
CO
Basin
Arkansas
Water Division
2
Date
4/1/1975
Author
Corps of Engineers
Title
Detailed Project Report - Holly-Colorado - Arkansas River Watershed-Colorado - Report
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />36 <br /> <br /> <br />Or......., <br />1..4..:.62 <br />. <br /> <br />FEDERAL RESPONSIBILITIES <br /> <br />The United States would design and prepare detailed plans, con- <br /> <br />struct the flood protection works, provide a maintenance and operation <br /> <br />manual to the local sponsor, and inspect the project annually to insure <br /> <br />proper maintenance. <br /> <br />NON-FEDERAL RESPONSIBILITIES <br /> <br />Non-Federal local interests would provide the following: <br /> <br />a. Provide all lands, easements, riRhts-of-way, and spoil disposal <br /> <br />areas necessary for construction, maintenance and operation of the proj- <br /> <br />ect. <br /> <br />b. Bear the cost of all alterations and relocations of utilities <br /> <br />and any other community services that are required for construction of <br /> <br />the project. Cost of these locations is presently estimated at $15,000. <br /> <br />c. Hold and save the United States free from damages due to the <br /> <br />construction of the project. <br /> <br />d. Prevent any encroachment that would prevent or restrict the <br /> <br />flow in the existing channels. <br /> <br />e. Prevent any encroachment on the ponding areas that would decrease <br /> <br />the capacities. <br /> <br />f. Maintain and operate the project in accordance with the regu- <br /> <br />lations prescribed by the Secretary of the Army. <br /> <br />g. Assume full responsibility for all project costs in excess of <br /> <br />the Federal cost limitation of $1,000,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.