My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06670
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:12:07 PM
Creation date
10/12/2006 1:47:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
9/16/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.1\ 0 ^ r .. <. <br />-u lv.!\) <br /> <br />. <br /> <br />. <br /> <br />^ <br />, <br />I General Investigations <br /> <br />Feasibi~ity Investigations <br /> <br />The ANIMAS LA PLATA feasibility report vas transmitted to the Bureau <br />of the Budget on April ~O, 1964, to obtain views of that agency rela ti ve <br /> <br />to submittal of the report to Congress. <br /> <br />The DOLORES PROJECT feasibility report was adopted by the Secretary <br /> <br />on October 2, 1964, and sent to State and Federal agencies for formal <br /> <br />review under the Flood Control Act of 1944. The Secretary has received <br /> <br />comments fran reviewers. The final report is being prepared and is <br /> <br />expected to be forwarded to the Bureau of the Budget in the near future. <br /> <br />The Ute Mountain Tribal CO\U1cil on July 21, 1965, passed a reso- <br /> <br />lution to participate in the Animas La Plata and Dolores Projects. <br /> <br />The proposed feasibility report for the DALLAS CREEK PROJECT bas <br /> <br />been reviewed by the Commissioner and Chief Engineer. The report has <br /> <br />been distributed to Federal, State, and local agencies for formal review. <br /> <br />Feasibility designs and est:lJllates on the WEST DIVIDE PROJECT are <br /> <br />essentially cOlllpleted. Preparation of appendixes and writing of the <br /> <br />proposed feasibility report are in progress. The report is scheduled <br /> <br />to be completed by the end of this calendar year. <br /> <br />On the SAN MIGUEL PROJECT, feasibility designs and estimates have <br /> <br />been cOlllpleted. Financial and economic analyses studies and preparation <br /> <br />of the proposed feasibility report are in progress. The proposed report <br /> <br />is scheduled to be cOlllpleted in tl1e fall of this year to be available <br /> <br />for consideration by the State of Colorado. <br /> <br />Preparation of design data, plan formulation studies, water supply <br /> <br /> <br />studies, and agricultural economic studies are in progressron the <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.