My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06636
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:41 PM
Creation date
10/12/2006 1:46:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543.900
Description
Closed Basin Division - Project Funding
State
CO
Basin
Rio Grande
Water Division
3
Date
3/14/1989
Title
Agenda Item 8 - March 20-21 1989 - Board Meeting -- Closed Basin Project Cost-Sharing Agreement
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Ci) <br />00 <br />L~ Members, CWCB <br />y~ March 14, 1989 <br />t', Page two <br /> <br />~-.') <br /> <br />potential problem, I have proposed to Reclamation <br />that the first payment from the state would not <br />be due and forthcoming until construction on <br />Stage 4 is completed or the first construction <br />contract on Stage 5 is awarded, whichever occurs <br />first. At that time, the state would make a <br />lump sum payment to Reclamation for one-third of <br />all costs incurred by Reclamation beyond $75 <br />million as is required by last year's legislation. <br />From that point forward the Board would make its <br />cost-sharing payments concurrently, up to the <br />legislated limit of $6 million. It tentatively <br />appears that this arrangement is acceptable to <br />Reclamation and I recommend it to the Boar~ as it <br />obviously protects the Board's position. <br /> <br />Unless the Board has any concern about these three principal <br />positions, I will proceed to conclude negotiations with Reclama- <br />tion, with the final proposed cost-sharing agreement being <br />subject to final action and approval by the Board at a subsequent <br />meeting, hopefully in May. <br /> <br />BMcD:mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.