My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06613
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:34 PM
Creation date
10/12/2006 1:45:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
11/16/1982
Author
USDOE/WAPA
Title
Hearing on Information Forum, CRSP, Proposed Adjustments of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />thilt cOJlstrurtion pr('lty Jnuch follol'l. As" for instnnce, if <br /> <br />2 you tAke a project that Jnay start two years from now, and has a <br /> <br />3 l? yeAr construction perio~ identifie~ in the definite plan <br /> <br />4 report, that construction period then would trigger when the <br /> <br />5 revenues would he requircf ilt the cn~ of the rcpilyment. <br /> <br />(, <br /> <br />MI1. IIELSBEI1G: And thilt Is done on a block by hlock basis; ) <br /> <br />7 Is that correct? <br /> <br />8 <br /> <br />1v111. COO!<: Yes. <br /> <br />If that pilrticular plan use~ block <br /> <br />9 consideriltlon in repayment. <br /> <br />H <br /> <br />~111. IIFLSf'EllG: Cou]d We have inform,ltion that's available <br /> <br />I] with respect to the projects which nre under construction, and <br /> <br />]2 those wtlirh arc nwaiting construction showing the information <br /> <br />r-~ <br /> <br />13 th.,t you IHiVe provided which was used in the repayment study? <br /> <br />~ <br /> <br />] 4 <br /> <br />"'11. COOl,: ThAt can be provir'ed to you f:S Glade Bllrney of <br /> <br />]5 our office here in SAlt Lake points out. They are in the <br /> <br />I <br /> <br />16 annual report ilnd we can show that to you. We can provide t~at <br /> <br />17 to you. <br /> <br />IP <br /> <br />MH. IIF.LSflEflC: <br /> <br />~re they in the annuAl report on a block by <br /> <br />19 block basis? <br /> <br />20 <br /> <br />~m. COOl<: Yes. <br /> <br />I <br /> <br />21 <br /> <br />MI1. HF.LSflEI1G: We Ilould like to have thAt information. <br /> <br />I <br /> <br />22 <br /> <br />~1H. COOK: <br /> <br />Ok2Y. <br /> <br />23 <br /> <br />MI1. IIEL~:HEflr;: {,lien a unit is fun,kd for construction, is <br /> <br />I <br /> <br />24 the funding by block, by irrigiltion block, or is the funding <br /> <br />I <br /> <br />25 only r('lated to pi1rticu]i1r units of 11 particular proj('ct? In <br /> <br />39 <br /> <br />I <br /> <br />Intermountain Court fleporters <br />~r,1-11<)6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.