Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />1 int"o service in(l('p(>n(r(~nt of other blocks? <br /> <br />;> <br /> <br />111l. COO'<: Th"t's rigl;t, <br /> <br />:1 <br /> <br />r'11l. IIEU;P,/':PC: <br /> <br />YOII w"rp till king eArlier to()ilY About: four <br /> <br />~ critcrii, which you clAssifif,d vilrious projects before being <br /> <br />~) COI'lp]C.t".Prl, Ul\df~r construetion, flw'niting construction or <br /> <br />() inclctive." <br /> <br />7 <br /> <br />00 you cntA<]orize the vArious irrigiltion blocks in those <br /> <br />n CClf:.iH]0r.ics? <br /> <br />() <br /> <br />"111. COOl': \-'(> hi1\'c not "t this point. \-:ithin i1 project we <br /> <br />10 hilve not. <br /> <br />In other I-lOrc'i" the blocks would stilY ell with the <br /> <br />J 1 snn(> sti1tus thAt the projt'ct is in. <br /> <br />I? ~1H. fICLSp.Enc:: So in other words, il unit, say with 13 <br /> <br />]3 irrig,~,tion blocks, if one block \Jhere under construction, then <br /> <br />l~ the unit would he considered under construction even though a <br /> <br />15 numher of blocks may not be to that stAge yet? <br /> <br />Jf, <br /> <br />Mil. COOK: ThAt's correct. <br /> <br />~nd the timing of those <br /> <br />]7 cr'ditioof,] ~>locks \IOUJrl conform \Iith our i1nticipilted <br /> <br />Hi instruction schedule wiUdn the blocks witbin the project. <br /> <br />] 9 <br /> <br />MH. IIf:Lf-lPEHC: ^ fo]]o\1 up to th"t question, then. <br /> <br />Ci1n <br /> <br />;>0 the units or the status of the units be irlentified by block? <br /> <br />?l In oth(>r words, the i;i1m" criterii1 you hAve mentioned, or Any <br /> <br />2? other i1pp]icable eriterl,,? Could the stAtus be identified for <br /> <br />23 each b~ock of n unit? <br /> <br />:'1] <br /> <br />MH. r.00l(: Wel J -- <br /> <br />7 ~, <br /> <br />Mr:. Ilrl.~~llrr~C: <br /> <br />,~nd j" !I,,"f: rli"l:i'l i1V,'iIAhJ,,? <br /> <br />35 <br /> <br />IntermolJntnin Court Hcportrrs <br />'\r..) 1 ""If''': <br />