My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06613
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:34 PM
Creation date
10/12/2006 1:45:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
11/16/1982
Author
USDOE/WAPA
Title
Hearing on Information Forum, CRSP, Proposed Adjustments of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.-- <br /> <br />L- <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />. <br /> <br />1 blocks. <br /> <br />2 <br /> <br />The question Is, Is a block and a separable feature used <br /> <br />3 In the Silme manner, ,1nd I guess In fact then Is each block a <br /> <br />~ sepilrilhle feature of a unit of a project? <br /> <br />s <br /> <br />Since you are referring to the <br /> <br />MR. G^BIOLfI,: <br /> <br />r. l'i1rticipntinq projects, I think I'll ask W,lyne Cook to adrlress <br /> <br />7 t-hat question. <br /> <br />r. <br /> <br />MR. COnK: Dave, Irrl0ation blocks have more reference to <br /> <br /><] the repayment responsihi]ity for a given segment of an <br /> <br />10 irrigation part of D project and has to do with the timing in <br /> <br />11 which illl of the ff1cilities would be available so that all of <br /> <br />]2 thll wiltllr supply is available ilnd delivery facilities available <br /> <br />11 to deliver irrigation water to some common seqment within a <br /> <br />14 project, and for instance, multiplicity projects by the <br /> <br />15 Bonneville unit has self irrigation segments which the <br /> <br />lr. repayment stilrts ilt different times, <br /> <br />50 they are not separnble <br /> <br />17 features, but they are separated out so that the repayment <br /> <br />]R responsibilities vary, and do not come on line until all <br /> <br />19 facilities thi'lt make that Wi'lter available to the irrigator can <br /> <br />20 be suppl led by tbe projllct. <br /> <br />21 <br /> <br />I think you'll find tbat in a good deal of the <br /> <br />22 participating projects, the use of irrigation blocks in the <br /> <br />23 repayment schedule, rather than all irrigation being scheduled <br /> <br />24 at one time, 2nd thBt is diffllrent than separable features. <br /> <br />25 <br /> <br />MR. "~L5RERG: So that each individual block then can go <br /> <br />1~ <br /> <br />Intermountain Court Reporters <br />2r.1-l1<H; <br />
The URL can be used to link to this page
Your browser does not support the video tag.