Laserfiche WebLink
<br />. '~'- ',-. -.;...... 'J, "'-.' :.' <br /> <br />.: ~ ".-- .;.':~;." -. .;' <br /> <br />'-~ ..;.-,!. <br /> <br />"~"""., -. - <br /> <br />w <br />o <br />C> <br />t~ <br /> <br />The objectives of PrioritY,3 are: 1) to evaluate the seasonal <br />and downstream distribution of fecal coliform, total coliform, <br />and fecal streptococcus bacteria in the Arkansas River basin: 2) <br />to evaluate the seasonal and downstream variations in the <br />concentrations and loads of nitrogen and phosphorus at selected <br />points in the Arkansas River: 3) to assess the effects of <br />extensive recreational use on water quality in the upper Arkansas <br />River basin; and 4) to,make a preliminary evaluation of the <br />effects on water quality from wastewater discharges in the basin. <br /> <br />FY90 COST: $22,000 <br /> <br />PRIORITV 4-6 -- DATA COLLECTION ONLY <br /> <br />I <br />3 <br /> <br />The additional water~quality and other hydrologic data needed to <br />evaluate priority 4 -- Water-quality effects of operations of the <br />existing water-supply system: Priority 5 -- water-quality effects <br />of mine drainage and planned cleanup: and Priority 6 -- <br />Water-quality effects of new reservoirs upstream from Pueblo, are <br />small because most of the data needed to evaluate these issues <br />would be collected as part of Priorities 1 and 2. These <br />additional data could generally be collected concurrently with <br />data collected for Priorities 1 and 2, therefore, minimizing the <br />costs associated with the data-collection component for <br />priorities 4 through 6. . <br /> <br />,~. <br /> <br />j <br />.} <br />:.:1 <br />"j <br />.:'j <br />':.;2 <br />;;~~;,~ <br />':;::5 <br /> <br />FY90 COST: $42,000 <br /> <br />.'., <br /> <br />::''';~ <br /> <br />SUMMARY OF TOTAL COST: <br /> <br />.:.~ <br />....! <br />.:.~ <br /> <br />, <br /> <br />Priority FY90 FY91 FY92 FY93 FY94 FY95 FY96 <br />Prior! ty 1 $130,000 $160,000 $170,000 $ 80.000 $ 9,000 <br />Priority 2 75,000 77 , 000 102,000 186,000 230,000 $72,000 $7,000 <br />Priority 3 22,000 27,000 28,000 20,000 20,000 15,000 <br />Priority 4-6 42,000 51,000 53,000 11 . 000 <br />(Data collection only) <br />Grand total $269,000 $315,000 $353,000 $297,000 $259,000 $87,000 $7,000 <br /> <br />,', <br />~;.~ <br /> <br />". '~ <br />:} <br /> <br />..... <br />:,:,.; <br />"'-, <br /> <br />'. :~ <br /> <br />" <br /> <br />4 <br />