<br />. '~'- ',-. -.;...... 'J, "'-.' :.'
<br />
<br />.: ~ ".-- .;.':~;." -. .;'
<br />
<br />'-~ ..;.-,!.
<br />
<br />"~"""., -. -
<br />
<br />w
<br />o
<br />C>
<br />t~
<br />
<br />The objectives of PrioritY,3 are: 1) to evaluate the seasonal
<br />and downstream distribution of fecal coliform, total coliform,
<br />and fecal streptococcus bacteria in the Arkansas River basin: 2)
<br />to evaluate the seasonal and downstream variations in the
<br />concentrations and loads of nitrogen and phosphorus at selected
<br />points in the Arkansas River: 3) to assess the effects of
<br />extensive recreational use on water quality in the upper Arkansas
<br />River basin; and 4) to,make a preliminary evaluation of the
<br />effects on water quality from wastewater discharges in the basin.
<br />
<br />FY90 COST: $22,000
<br />
<br />PRIORITV 4-6 -- DATA COLLECTION ONLY
<br />
<br />I
<br />3
<br />
<br />The additional water~quality and other hydrologic data needed to
<br />evaluate priority 4 -- Water-quality effects of operations of the
<br />existing water-supply system: Priority 5 -- water-quality effects
<br />of mine drainage and planned cleanup: and Priority 6 --
<br />Water-quality effects of new reservoirs upstream from Pueblo, are
<br />small because most of the data needed to evaluate these issues
<br />would be collected as part of Priorities 1 and 2. These
<br />additional data could generally be collected concurrently with
<br />data collected for Priorities 1 and 2, therefore, minimizing the
<br />costs associated with the data-collection component for
<br />priorities 4 through 6. .
<br />
<br />,~.
<br />
<br />j
<br />.}
<br />:.:1
<br />"j
<br />.:'j
<br />':.;2
<br />;;~~;,~
<br />':;::5
<br />
<br />FY90 COST: $42,000
<br />
<br />.'.,
<br />
<br />::''';~
<br />
<br />SUMMARY OF TOTAL COST:
<br />
<br />.:.~
<br />....!
<br />.:.~
<br />
<br />,
<br />
<br />Priority FY90 FY91 FY92 FY93 FY94 FY95 FY96
<br />Prior! ty 1 $130,000 $160,000 $170,000 $ 80.000 $ 9,000
<br />Priority 2 75,000 77 , 000 102,000 186,000 230,000 $72,000 $7,000
<br />Priority 3 22,000 27,000 28,000 20,000 20,000 15,000
<br />Priority 4-6 42,000 51,000 53,000 11 . 000
<br />(Data collection only)
<br />Grand total $269,000 $315,000 $353,000 $297,000 $259,000 $87,000 $7,000
<br />
<br />,',
<br />~;.~
<br />
<br />". '~
<br />:}
<br />
<br />.....
<br />:,:,.;
<br />"'-,
<br />
<br />'. :~
<br />
<br />"
<br />
<br />4
<br />
|