Laserfiche WebLink
<br />l'\J <br />(C <br />D <br />In <br /> <br />CONTENTS <br /> <br />Page <br /> <br />Executive summary----------------------------------------- 1 <br /> <br />Synopsis of phase 1 of study------------------------------ 5 <br /> <br /> <br />Work plan for Priority 1---------------------------------- 8 <br /> <br /> <br />Work plan for Priority 2---------------------------------- 15 <br /> <br /> <br />Work plan for Priority 3---------------------------------- 23 <br /> <br /> <br />Data collection plan for evaluating water-quality <br /> <br />priorities 4 through 6---------------------------------- 28 <br />Lower priority water-quality concerns--------------------- 32 <br /> <br />References------------------------------------------------ 33 <br /> <br />Attachment 1 -- summary of current U.S. Geological <br />survey water-quality monitoring network----------------- 35 <br /> <br />Attachment 2 -- Summary of historical u.s. Geological <br /> <br /> <br />survey water-quality monitoring network----------------- 39 <br /> <br /> <br />Attachment 3 -- Summary of proposed water-quality <br /> <br /> <br />monitoring network-------------------------------------- 45 <br /> <br />Attachment 4 -- Chemical mass balance of metals in <br /> <br />the upper Arkansas River basin - assessing variability <br />of chemical processes at inflows------------------------ 52 <br /> <br />i <br />