Laserfiche WebLink
<br />" <br /> <br />and w~ll be completed in October 1977. A preliminary design <br /> <br />for the relocation of U.S. Highway 550 has been completed by <br /> <br />the Colorado Department of Highways. <br /> <br />2. Conditions requiring special consideration in design, such <br />rJO, <br />as seismic and foundation conditions: There arevcreditab1e <br /> <br />. <br />, <br />questions regarding safety of project features. Final engineering <br /> <br />designs have not yet been initiated. Design criteria and <br /> <br />procedures will be in accordance with the best engineering <br /> <br />practice, and independent engineering reviews of principle <br /> <br />structures wi~l be conducted in conformance with recently <br /> <br />formulated policy. <br /> <br />D. <br /> <br />Institutional' <br /> <br />1. Identification of beneficiaries: <br /> <br />a. Agricultural: <br /> <br />1. Number of farms 2,350 <br /> <br />2. Number of individuals 8,200 <br />3. No individual farm family would receive over 5 percent <br /> <br />of the direct project benefits. <br /> <br />b. Municipal: <br /> <br />1. Cities: Montrose, Delta, 01athe, Ridgway, Uneompahg <br /> <br />Valley rural areas. <br /> <br />2. Total number of individuals - 22,400 present to 95,000 <br /> <br />~y year 2020. <br /> <br />e. Li~lt industrial: not yet determined <br /> <br />d. <br /> <br />Recreational: 354,000 recreation _days, . <br /> <br />~, <br />~ <br /> <br />) ~ <br />. t" t~..~ .: <br /> <br />17 <br />