Laserfiche WebLink
<br />~ <br />co <br />()') <br />(\,1 <br />C <br />C <br /> <br />Tucson Mountain Park <br /> <br />With both plans, a pipeline would be constructed east of Cat Mountain <br />across the Tucson Mountain Park. About 2,000 feet of pipeline would cross <br />the park. The pipeline would be buried and the disturbed area revegetated. <br />The area to be used for the pipeline has been identified by the Pima County <br />Parks Department as an access point to the county park and use confl icts <br />are not expected, <br /> <br />SELECTION OF PROPOSED PLAN <br /> <br />Comparison of Plans <br /> <br />Tables 2 through 4 show a comparison of each plan for the factors consider- <br />ed critical to plan selection. Table 5 summarizes these factors to compare <br />the trade-offs between plans. <br /> <br />The Bureau will be selecting a prqposed plan based on the technical infor- <br />mation sununarized in this Information Packet and public comment. Please <br />take the opportunity to fill out the response form at the end of the packet <br />with your comments and send it back to the Bureau. This will insure that <br />your comments are considered in selecting the agency's proposed action. <br /> <br />12 <br />