Laserfiche WebLink
<br />PROFESSIONAL RECORD <br /> <br />MAX K. KUEHL <br /> <br />EDUCATION <br /> <br />Civil and Structural Engineering Degree, Government Technical College, <br />Coburg, Germany, 1949. <br /> <br />SPECIALTIES <br /> <br />Planning * Design of Dams * Power Plants <br />draulic Structures * Feasibility Studies * <br /> <br />* Tunnels <br />Scheduling <br /> <br />,~ <br /> <br />Hy- <br /> <br />EXPERIENCE <br /> <br />Vice President and Chief En ineer, Engineering Consultants, Inc. , <br />Denver, Colorado 1973 to date. Responsible for all technical matters <br />within the company. Current projects being carried out by ECI include: <br /> <br />Central Luzon Master Plan A comprehensive basin-wide recon- <br />naissance study of land and water resources of an 18,000 square <br />kilometer basin in the Philippines. The work includes hydrology, <br />agricultural studies, planning and economics, carried out by a large <br />client staff and a small group of expatriate specialists in Denver <br />and Manila. The work is financed in part by the World Bank and will <br />be carried out over a four-year period. <br /> <br />Citanduy Feasibility Study - A basin study, financed in part by the <br />U.S. Agency for International Development, to establish a program <br />for land and water development in the Citanduy River Basin in Java, <br />Indonesia. The work features two feasibility studies and a Master <br />Plan, with emphasis on flood control, riceland irrigation, tideland <br />reclamation and hydroelectric power. <br /> <br />Aurora Project - A transbasin diversion scheme in Luzon, Philip- <br />pines, to divert water from an adjoining basin into the existing <br />Pantabangan reservoir for irrigation and hydropower. The project <br />includes two small dams, a transbasin canal, and an irrigation <br />service area downstream. The project has qualified for World Bank <br />financing and is under construction. <br /> <br />Thaukyegat Hydroelectric Project - Work involves the investigations <br />necessary to prepare a comprehensive design report and specifica- <br />tions for a major hydroelectric project in the Union of Burma. The <br />investigations are currently being carried out jointly by the <br />Burmese Electrical Power Corporation and ECI staff. Preliminary <br />