My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06468
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:55 PM
Creation date
10/12/2006 1:39:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8583
Description
Rio Grande Decision Support System
State
CO
Basin
Rio Grande
Water Division
3
Date
6/15/1998
Author
CWCB
Title
Rio Grande Decision Support System Additional Guidance Sheet
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'.f. <br /> <br />(', I J <br />I. V <br /> <br />2. Enhance the recharge package to include a soil moisture component that estimates <br />recharge based on demand, soil properties, and water supply (precipitation, <br />surface diversions and ground water pumping), <br />3. Enhance the stream package to include StateMod functionality (diversion and <br />reservoir operations via the prior appropriation doctrine), <br /> <br />State Management Team <br />The State management team expected to guide the development of the Rio Grande <br />Decision Support System is as follows: <br /> <br />RGDSS State Management Team <br />(June 18, 1998) <br /> <br />Title <br />Project Manager <br />CWCB Senior advisor <br />DWR Senior Advisor <br />CWCB Assistant <br />DWR Assistant <br />RGDSS Advisory Committee <br /> <br />Person <br />Ray R. Bennett <br />Randy Seaholm <br />Will Burt <br />Andy Moore <br />Contracted Project Management Assistant <br />Division 3 Representatives <br /> <br />Other participants may include: <br />· Dewayne Schroeder for Ground Water Expertise, <br />· Ray Alvarado for Surface Water Expertise, <br />· Mike Sullivan and Steve Vandiver for Division 3 expertise, <br />· Ken Knox and Jack Byers for assistance to the DWR Senior Advisor, <br />· Technical subcommittees for: (I) Ground Water, (2) Surface Water, (3) Consumptive <br />Use and Basin Water Budget, and (4) System Integration. <br /> <br />Miscellaneous Feasibility Study Revisions <br />Following are miscellaneous contract revisions which have been identified by the State to <br />date: <br />· The Schedule must be revised to allow Task 5.2.1.1, Stream Gages (12), and Task <br />5.2.1.2 Diversion Gages (8) to be installed in the first year. This may necessitate <br />fewer wells being constructed in phase (year) 1. <br />· The Water Resource Planning model should be completed up to and including task <br />5.2.2.12 within the first two phases (years). <br />· The Water Resource Planning model application and budget should consider <br />developing a model capable of operating on both a daily and monthly time step. <br />(Note: The StateMod program is already capable of operating on a daily basis and <br />any enhancements to the existing data management interfaces would occur under the <br />System Integration contract). <br />· Task 5.2.4.1, Acquire Computer Hardware will, in general, purchase desktop <br />computers, not laptops. <br /> <br />C:\ WINDOWS\TEMP\Guidence.doc <br /> <br />06/22/98 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.