Laserfiche WebLink
<br /> <br />2002 <br /> <br />TABLE 1. <br /> <br />APPARENT INFLOW TO HERON RESERVOIR <br /> <br />(UNIT = ACRE-FEET) <br /> <br />---TABLE:1- --~~-- -- ,----- WILLOW-' TRIBUTARY-- TRIBUTARY COJiijpUTEO- <br />Inflow to Heron AZOTEA COMPUTED CREEK INFLOW COMPUTED INFLOW NATURAL <br /> TUNNEL CHANNEL ABOVE ABOVE INFLOW WITHIN FLOW <br />MONTH OUTLET LOSS HERON HERON TO HERON HERON AT HERON <br /> RESERVOIR RESERVOIR RESERVOIR RESERVOIR RESERVOIR <br /> 13+2-1) (4)*FACTOR TBL2(30r4) 5+60rSEEP <br /> I1l (2) (31 (4) (5) (6) (7) <br />JANUARY 01 0 01 0 01 131 131 <br />FEBRUARY 0 0 01 0 0 116 116 <br />MARCH <br />APRIL <br />MAY <br />JUNE <br />JULY . <br />AUGUST <br />SEPTEMBER <br />OCTOBER <br />NOVEMBER <br />DECEMBER . <br />ANNUAL 0 0 0 0 0 247 247 <br /> <br />(5) COMPUTED INFLOW TO HERON RESERVOIR=TRIBUTARY INFLOW ABOVE HERON <br />TIMES CORREtA TION FACTOR (1.2 FOR MONTHLY WILLOW CREEK NATURAL <br />FLOW ABOVE 360 AF AND 2.46 FOR FLOW AT 360 AF AND BELOW. IF THE <br />INFLOW DOES NOT EXCEED THE SEEPAGE THIS FLOW IS NOT BYPASSED. <br />FLOWS ABOVE THE SEEPAGE ARE BYPASSED.) <br /> <br />(6) THIS COLUMN REPORTS THE SEEPAGE 2(4} AS THE BASE NATURAL FLOW OR <br />THE NET GAIN ON RESERVOIR 2(3} WHICH EVER IS GREATER OR ZERO WHEN <br />2(3} IS ZERO AND 1 (5) IS MORE THAN SEEPAGE. (SEE TABLE 2) <br /> <br />(7) THIS COLUMN REPORTS THE SUM OF 1 (5) AND 1 (6) ONLY WHEN 1 (5) EXCEEDS <br />THE SEEPAGE. THIS WILL PREVENT ANY DOUBLE ACCOUNTING OF THE BASE <br />NATURAL FLOW (SEEPAGE). IF 1(5} IS LESS THAN OR EQUAL TO SEEPAGE THEN <br />1(7} EQUALS 1(6}. <br />