My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06337
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:17 PM
Creation date
10/12/2006 1:34:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
6/1/2003
Author
US DoI BoR
Title
Final Environmental Assessment and Finding of No Significant Impacts EC-1300-03-01 For the Pueblo West Pipeline and Pumping Station Project
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., r 4 :, <br />I.:.~.i.'-:t <br /> <br />Construction Alternative - This alternative has the potential to spread noxious weeds. Construction <br />activities have the potential to both facilitate dispersal of noxious weeds, and also create suitable <br />disturbed sites that would facilitate spread of noxious weeds. <br /> <br />To address this potential impact, the following mjtigation will be required: <br /> <br />. Noxious weeds, such as salt cedar and Russianknapweed, present within areas that will have <br />ground disturbance will be removed and properly disposed of to avoid further contamination. <br /> <br />. All areas disturbed during construction activities will be recontoured to pre-construction grade <br />and seeded using native grasses, For a period of three years after reseeding, Pueblo West will <br />monitor the construction alignment on Reclamation lands for noxious weeds and, if noxious <br />weeds are found, treat them in accordance with the Pest Management Plan for Pueblo <br />Reservoir. In addition, Pueblo West will be responsible for re-seeding the construction area on <br />Reclamation lands for up to two (2) additional reseedings/years (in addition to the original <br />reseeding), if Reclamation staff determines that the initial revegetation of the site is not <br />successful. ' <br /> <br />. Concentrated areas of Russian knapweed adjacent to the construction area will be identified <br />and equipment travel in these areas will be avoided by using fencing or similar measures to <br />discourage entry. ; <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.