Laserfiche WebLink
<br />2333 <br />2334 <br />2335 <br />2336 <br />2337 <br />2338 <br />2339 <br />2340 <br />2341 <br />2342 <br />2343 <br />2344 <br />2345 <br />2346 <br />2347 <br />2348 <br />2349 <br />2350 <br />2351 <br />2352 <br />2353 <br />2354 <br />2355 <br />2356 <br />2357 <br />2358 <br />2359 <br />2360 <br /> <br />, <br />.' <br /> <br />. <br /> <br />93 <br /> <br />~I <br /> <br />GCMRC Studies. Three ongoing GCMRC projects are providing information that <br />complements data collected under the P A program. This information includes a data <br />synthesis of previously collected information under the P A program, mainstem flow and <br />deposition modeling, and testing of a geomorphic erosional hypothesis. Compilation of <br />existing data from a number of sources will identify data gaps in previously collected data. <br />In addition, analysis currently underway will provide information on changes in site <br />conditions over time. Empirical data has been collected for the projects addressing mainstem <br />flow modeling and geomorphic hypothesis testing. Project data from the three efforts is <br />expected in FY 99. <br /> <br />" <br /> <br />i <br /> <br />" <br /> <br />" <br />, <br />,. <br /> <br />2. Management ObjectiveslInformation Needs! Proposed Activities <br />The past work provides a knowledge base to formulate a long-term monitoring and <br />research plan that addresses the AMWG objectives for cultural resources that may be <br />affected by the dam operations. The cultural resource portion of this Program is organized <br />around the four stakeholder identified MOs and the associated INs. The above MOs were <br />developed in consultation with a technical subgroup of the AMWG composed of individuals <br />with resource expertise and they were designed to mirror the stipulations developed within <br />the P A program. INs were also developed with the group to assist in meeting the objectives. <br />In Spring 1998, the INs were prioritized by stakeholders to provide guidance to GCMRC in <br />scheduling project activities. The MOs and INs are listed below and on the cultural resource <br />section of Appendix A. The INs and their associated prioritization within the area of cultural <br />resources are included below and detailed in Appendix B. The proposed activities for this <br />planning period (FY 2000-2004) are organized around the MOs and INs. Some of these <br />information needs will be satisfied during portions of this plan while others will continue <br />throughout the planning period and into the future. <br /> <br />., <br />l< <br />'? <br />So <br />~ <br /> <br />~'. <br /> <br />'", <br />;. <br />;: <br />,..; <br /> <br />," <br />" <br /> <br />",' <br />:'-:'. <br /> <br />'~. <br /> <br />~. : <br /> <br />; <br />\. <br />'" <br />;';\ <br /> <br />0- <br />, <br />;~" <br />'0, <br /> <br />" <br />",,-, <br /> <br />.' <br />'" <br />~A <br />., <br />~ <br />~... <br />:i <br /> <br />;"( <br />~.~ <br /> <br />-., <br /> <br />MOl) Conserve in situ all the downstream cultural resources and take into account Native <br />American cultural resource concerns in the Colorado River ecosystem, <br /> <br />November 5, 1998 <br />Second Draft - Do Not Cite, Photocopy, or Distrihute <br />