My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06301
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:08 PM
Creation date
10/12/2006 1:33:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.C
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
11/5/1998
Title
The Grand Canyon Monitoring & Research Center Fiscal Year 2000-2004 Monitoring & Research Strategic Plan (pp 88-147 & Appendix A)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2674 <br />2675 <br />2676 <br />2677 <br />2678 <br />2679 <br />2680 <br />2681 <br />2682 <br />2683 <br />2684 <br />2685 <br />2686 <br />2687 <br />2688 <br />2689 <br />2690 <br />2691 <br />2692 <br />2693 <br />2694 <br />2695 <br />2696 <br />2697 <br />2698 <br />2699 <br />2700 <br />2701 <br />2702 <br /> <br />105 <br /> <br />" <br /> <br />sport hunting and wildlife viewing opportunities in Glen Canyon. <br />IN 5.1 Define pattern of waterfowl hunting use and satisfaction and other wildlife <br />use and conflicts to other uses. [Priority 14] <br />Proposed Activities: <br />Information from ongoing projects addressing recreational issues will be assembled to <br />evaluate future projects in this area. No specific projects are proposed at this time. <br /> <br />:., <br />" <br /> <br />C. Economic Market Activities <br />C. i. Hydropower Supply <br />Hydropower supply is an integral part of the economy of the region and a valuable <br />and important resource. It is a product of the Glen Canyon Dam power plant electrical <br />generation that contributes significant power to rural electrical associations, public <br />municipalities, irrigation districts and Federal and State facilities in the Southwestern and <br />Rocky Mountain areas of the United States. Changes in power operations resulting from <br />changes in annual dam operations would affect the power supply and its costs to power users. <br />The stakeholders' Mas and INs are: <br /> <br />.. <br />" <br /><: <br />..~ <br />~: <br /> <br />:~. <br /> <br />Mal) Maximize the value onong term power and ener2Y generation within the criteria and <br />operating plans established by the Secretary under Section 1804 of the 1992 GCPA. <br />IN 1.1 Continue to monitor the amount of revenues collected from the generation of <br />electrical power at the Glen Canyon Power plant; <br />IN 1.2 Continue to account for the financiaVeconomic cost of the operational changes <br />at Glen Canyon Dam due to the ROD including rate impacts to Colorado River Storage <br />Project (CRSP) long-term firm electrical customers; <br />IN 1.3 Calculate the financial costs of research flows so that these costs can be <br />declared "non-reimbursable" (as defined by Section 1804 of the Grand Canyon Protection <br />Act); and <br />IN 1.4 Monitor any difficulties in operating an integrated electrical system, including <br />regulating a load control area. <br /> <br />:~':: <br /> <br />.. <br />r.'" <br /> <br />.. <br />, <br /> <br />';', <br /> <br />.-i <br />~.~ <br /> <br />" <br />") <br />0- <br />t: <br />";:': <br />, <br /> <br />,) <br /> <br />November 5, 1998 <br />Second Draft - Do Not Cite, Photocopy, or Distribute <br />
The URL can be used to link to this page
Your browser does not support the video tag.