<br />C Channel Stabilization
<br />D Drainage
<br />E Erosion Control
<br />F Fish and Wildlife
<br />FC Flood Control and Detention
<br />I Irrigation
<br />M "unicipal and Industrial Water
<br />/I !lDv; gatio!1
<br />P Power
<br />R Recreation
<br />
<br />:::::;,~;II
<br />:~~.~~.:~~~;(
<br />~
<br />
<br />,.......'1
<br />:}':{I
<br />~"<,:::,:::"
<br />
<br />::.~
<br />
<br />Function, The functions or purposes of ~ach develop-
<br />ment are swnmarized by the following symbols, The order
<br />of listing is alphabetical and does not imply priority or
<br />principal or secondary Function.
<br />
<br />. ~/\..:~.~ I
<br />'.': .'::'.
<br />. ..'
<br />
<br />_. ". I
<br />,".
<br />
<br />',:;'j
<br />"
<br />:'.'
<br />
<br />....-
<br />
<br />. .. :~
<br />
<br />.~,~.~
<br />
<br />.........
<br />" '. ",.
<br />
<br />,
<br />.~
<br />
<br />Description, A brief description of each development
<br />is presented with specific reference to major features.
<br />Certain capacities are al~o included, such as storage
<br />capacity of reservoirs in acre-feet; installed capacity
<br />'of hydroelectric powerplants in kilowatts; acres to be
<br />irrigated, both full and supplemental water supply, etc.
<br />
<br />ft~:':~~;
<br />
<br />
<br />~~~i:i:
<br />'~f:/1#f;: I
<br />""I
<br />~J}!'f~,
<br />
<br />':,"',>..1
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />....:,...'.
<br />
<br />~;;,;:~ji
<br />
<br />(':"'.~ .
<br />
<br />'.:':
<br />
<br />,z~.:
<br />....)
<br />."-:.j
<br />
<br />.~.'
<br />.:.::\
<br />
<br />, :.~
<br />
<br />Cost. The total estimated cost shown represents the'
<br />estimated cost as derived at the current status of the
<br />project, In the firs.t two categories, i.e., in operation
<br />and under construction, the total estimated costs include
<br />investigation and precon'struction planning acti vi ties as
<br />well as construction costs. For authorized developments
<br />the amounts shown are for the investigation costs and
<br />estimated prcconstruction planning costs prior to construc-
<br />tion; where they are available, total costs are sho"n in
<br />parentheses. For Category D, developments in the investi-
<br />gation and planning phase prior to authorization, the costs
<br />pertain only to that activity since overall d~velopment
<br />costs have not been firmly developed...
<br />
<br />'.'
<br />.,':
<br />
<br />.:.:'~.i'
<br />
<br />".
<br />
<br />~.~
<br />'1
<br />%~
<br />
<br />I:.~
<br />
<br />Schedule. The dates shown are applicable to. the current
<br />status only, Dates prior to January 1962 are actual,. and
<br />those subsequent thereto represent currently scheduled or
<br />projected dates. Where a scheduled date has not yet been
<br />established, an asterisk (*) is placed in the column.
<br />
<br />;
<br />"
<br />
<br />Developments which are deferred or are considered inactive have
<br />not been included in the tabulations described above. For information
<br />purposes they are listed on a page just preceding the map. Some of
<br />
<br />::~'~,:~ .~.<)"
<br />',-:>:,.:".-:'
<br />";,,,,'>..1
<br />.!.':\fl
<br />
<br />3
<br />
<br />..
<br />
<br />;;~ii:;;: 1
<br />
<br />...".....:.,1
<br />
<br />... .:'
<br />
<br />;',.",1
<br />~~, .... ;:,'
<br />
<br />~r~:;:::'~:k.;;W{:W~;;;':", .,..:.~.~i.~.;~;?/;;;:.:,;{':i.,;~:i}.;);.).'::~..~:,'i.H::~0<;::7i.::,~;'A:;;,:~:;5~ti'-~o;~(j/:;;:.:q.m..;~H><:)<"'i;:.K;\;';:,? :'~l;,:<::5'~:!:11
<br />
<br />. . ;:.:', :...,.,.~'" .-
<br />
|