Laserfiche WebLink
<br />.;.:.1 <br />""'1 <br />";1 <br /> <br />003J2fl <br /> <br />. ..,....:. <br />::~.~.;.~~:<~ <br />'.-"':....:f <br /> <br />~.;:,~ <br />:.-.:.j <br /> <br />C Channel Stabilization <br />D Drainage <br />E Erosion Control <br />F Fish and Wildlife <br />FC Flood Control and Detention <br />I Irrigation <br />M "unicipal and Industrial Water <br />/I !lDv; gatio!1 <br />P Power <br />R Recreation <br /> <br />:::::;,~;II <br />:~~.~~.:~~~;( <br />~ <br /> <br />,.......'1 <br />:}':{I <br />~"<,:::,:::" <br /> <br />::.~ <br /> <br />Function, The functions or purposes of ~ach develop- <br />ment are swnmarized by the following symbols, The order <br />of listing is alphabetical and does not imply priority or <br />principal or secondary Function. <br /> <br />. ~/\..:~.~ I <br />'.': .'::'. <br />. ..' <br /> <br />_. ". I <br />,". <br /> <br />',:;'j <br />" <br />:'.' <br /> <br />....- <br /> <br />. .. :~ <br /> <br />.~,~.~ <br /> <br />......... <br />" '. ",. <br /> <br />, <br />.~ <br /> <br />Description, A brief description of each development <br />is presented with specific reference to major features. <br />Certain capacities are al~o included, such as storage <br />capacity of reservoirs in acre-feet; installed capacity <br />'of hydroelectric powerplants in kilowatts; acres to be <br />irrigated, both full and supplemental water supply, etc. <br /> <br />ft~:':~~; <br /> <br /> <br />~~~i:i: <br />'~f:/1#f;: I <br />""I <br />~J}!'f~, <br /> <br />':,"',>..1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />....:,...'. <br /> <br />~;;,;:~ji <br /> <br />(':"'.~ . <br /> <br />'.:': <br /> <br />,z~.: <br />....) <br />."-:.j <br /> <br />.~.' <br />.:.::\ <br /> <br />, :.~ <br /> <br />Cost. The total estimated cost shown represents the' <br />estimated cost as derived at the current status of the <br />project, In the firs.t two categories, i.e., in operation <br />and under construction, the total estimated costs include <br />investigation and precon'struction planning acti vi ties as <br />well as construction costs. For authorized developments <br />the amounts shown are for the investigation costs and <br />estimated prcconstruction planning costs prior to construc- <br />tion; where they are available, total costs are sho"n in <br />parentheses. For Category D, developments in the investi- <br />gation and planning phase prior to authorization, the costs <br />pertain only to that activity since overall d~velopment <br />costs have not been firmly developed... <br /> <br />'.' <br />.,': <br /> <br />.:.:'~.i' <br /> <br />". <br /> <br />~.~ <br />'1 <br />%~ <br /> <br />I:.~ <br /> <br />Schedule. The dates shown are applicable to. the current <br />status only, Dates prior to January 1962 are actual,. and <br />those subsequent thereto represent currently scheduled or <br />projected dates. Where a scheduled date has not yet been <br />established, an asterisk (*) is placed in the column. <br /> <br />; <br />" <br /> <br />Developments which are deferred or are considered inactive have <br />not been included in the tabulations described above. For information <br />purposes they are listed on a page just preceding the map. Some of <br /> <br />::~'~,:~ .~.<)" <br />',-:>:,.:".-:' <br />";,,,,'>..1 <br />.!.':\fl <br /> <br />3 <br /> <br />.. <br /> <br />;;~ii:;;: 1 <br /> <br />...".....:.,1 <br /> <br />... .:' <br /> <br />;',.",1 <br />~~, .... ;:,' <br /> <br />~r~:;:::'~:k.;;W{:W~;;;':", .,..:.~.~i.~.;~;?/;;;:.:,;{':i.,;~:i}.;);.).'::~..~:,'i.H::~0<;::7i.::,~;'A:;;,:~:;5~ti'-~o;~(j/:;;:.:q.m..;~H><:)<"'i;:.K;\;';:,? :'~l;,:<::5'~:!:11 <br /> <br />. . ;:.:', :...,.,.~'" .- <br />