Laserfiche WebLink
<br />" <br /> <br />~ <br />1-" <br />~ <br />0) <br /> <br />;., <br /> <br />NPDBS Pennit No. CO-0042161 <br />Salinity Control Study <br /> <br />Twentymile Coal Company <br /> <br />i. <br /> <br />TABLE 8 <br /> <br />Capital and Operating Costs for Option 3 <br /> <br />, <br /> <br />, <br /> <br />CAPITAL COSTS <br /> <br />, <br /> <br />Direct Costs <br /> <br />Distribution Pump with Intake and Controls <br />(installed in building) <br /> <br />$5,000 <br /> <br />Metal Building on Concrete Slab <br />'(14' x40' x 10', galvanized, insulated metal bldg with <br />'heating and lighting on an 8" concrete foundation) <br /> <br />$40,000 <br /> <br /> <br />Electrical (installed) <br /> <br />$20,000 <br /> <br />Piping (installed) <br /> <br />$5.000 <br /> <br />,Pond Improvements <br /> <br />$20,000 <br /> <br />'Deep Well (driUing, material, installation, etc.) <br /> <br />$2,000,000 <br /> <br />Indirect Costs <br /> <br />Engineering Design <br /> <br />$106.000 <br /> <br />j;ontingency <br /> <br />$209,000 <br /> <br />tOTAL CAPITAL COST ' <br />! <br /> <br />$2,405,000 <br />- <br /> <br />~NNUAL OpERATING COSTS <br /> <br /> <br />Iileetrieal' Power 90 KWH/day @ $0. 12/KWH <br /> <br />$4.000 <br /> <br />Qperation & Maintenance <br />(iNages, insurance, repairs) <br /> <br />$90;000 <br /> <br />~QTA'" ANNUAL OPERATING COST <br /> <br />$94,000 <br /> <br />AHA F'd~c: j4SALCNl.DOC <br /> <br />Page 31 <br /> <br />11:59 AM 09/29/9,5 <br /> <br />;..;- <br />'J: <br />~". <br />