Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. , <br /> <br />130235'7 <br /> <br />CHAPTER III <br /> <br />PROJECT DEVELOPMENT <br />(Yellow Jacket unit) <br /> <br />A construction period of about 4 years would be re~uired for the <br />Yellow Jacket unit with the work liDlited, because of climatic conditions, <br />to the period from April through November. A camp would be necessary for <br />the construction workers on Trappers Lake Dam and nearby features. Housing <br />for workers on other features of the unit could be furnished in the town <br />of Meeker, Colo., and possibly in Craig, Colo. <br /> <br />Cost estimates <br /> <br />The construction cost of the Yellow Jacket unit is estimated at <br />$18,710,000 or $490 for each acre of full service land or e~uivalent. Its <br />annual operation, maintenance, and replacement costs are expected to <br />amount to $10~,500. Estimated costs of the unit are iteDlized below. <br /> <br />Estimated costs--yellow Jacket unit <br /> <br />Item <br />Trappers Lake Reservoir <br />Thornburgh ReservOir <br />Yellow Jacket Canal!! <br />Josephine Basin ~~naLS/ <br />Coal Creek ~~na~1 <br />Axial Canalj <br />Channel stabilization <br />Laterals and drains <br />Past investigations <br />Future investigations <br />Total <br />!I Includes costs <br />canal and main canal. <br />gj Includes cost <br /> <br />Construction <br />cost <br />~l,300,OOO <br />1,926,000 <br />7,170)000 <br />1,996,000 <br />405,000 <br />2,724,000 <br />~30,OOO <br />2,644,000 <br />47,000 <br />168, COO <br />18,710,000_ <br />of feeder canal and diversion <br /> <br />Annual operation, <br />maintenance, and <br />replacement costs <br />$2,600 <br />3,200 <br />29,100 <br />17,300 <br />3,900 <br />20,000 <br />3,300 <br />24,100 <br /> <br />1')3,500 <br />dams for feeder <br /> <br />of diversion dams. <br /> <br />Unit lands and land use <br /> <br />The irrigable acreage to be served by the Yellow Jacket unit is <br />summarized below by land clasB. <br /> <br />Land <br />clasl3 <br />Class 1 <br />Class 2 <br />Class 3 <br />Total <br /> <br />Irrigable acreage--Yellow <br />(uni t--acres) <br />Full <br />irrigation <br />service <br />land <br />560 <br />20,080 <br />16,260 <br />36,900 <br /> <br />Total <br />660 <br />23,000 <br />17,480 <br />41,140 <br /> <br />Jacket uni t <br /> <br />Supplemental <br />irrigation <br />service <br />land <br />100 <br />2,920 <br />1)220 <br />4,240 <br /> <br />60 <br />