Laserfiche WebLink
<br />OO'ZM~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />CHAPI'ER III <br /> <br />PROJECT DEVELOPMENT <br />(Two Bar unit) <br /> <br />the canal diversion since the unit plan is <br />tailrace of the Cross Mountain powerplant. <br />would be 5,650 feet. <br /> <br />based on a diversion from the <br />The initial canal elevation <br /> <br />Laterals and Drains <br /> <br />Costs of latersls and drains were estimated frClll general data on costs <br />per acre for serving B~ilar lands of otner projects. The few artificial <br />drains that would be required would be relatively short and inexpensive. <br /> <br />Construction Considerations <br /> <br />Enlargement of Savery Dam is not expected to present any urusual <br />geological or construction problems. Special consideration would be <br />re~uired in the design and construction of the upper portions of the Two <br />Bar, Lily, and Deerlcdge Canals as these sections would encounter steep <br />slopes consisting of sandstone ledges and shale cliffs. <br /> <br />The Two Bar unit is expected to require a construction period of about <br />1 year. No additional construction camps would be required as camp facil- <br />ities for the potential projects on which the unit is dependent would be <br />available. <br /> <br />Cost estimates <br /> <br />Construction costs of the Two Bar unit arz estimated at $1,445,000 <br />or ;~;;40 for each acre of land to be served. Annual operation, maintenance, <br />and replacement costs are expected to amount to ~12,500. The estimated <br />costs are s~rized below. <br /> <br />Estimated costs--Two Bar unit <br /> <br />Item <br />Savery Reservo:i,r enlargement <br />Two Bar CanaJ.Y <br />Lily Canal <br />Deerlodge Cana~/ <br />Cross Mountain cana~/ <br />Laterals and drains <br />Past investigations <br />Future investigations <br />Total <br />11 Includes <br />2/ Includes <br />plant:- <br /> <br />Ar.nual operation, <br />maintenance, and <br />replacement costs <br />:;;300 <br />5,900 <br />700 <br />2,500 <br />1,300 <br />1,800 <br /> <br />Construction <br />cost <br />$79,000 <br />763,000 <br />82,000 <br />198,000 <br />91,000 <br />213,000 <br />1,000 <br />13,000 <br />1,445,000 <br />costs of diversion dams. <br />cost of head"orks at tailrace of Cross MOuntain power- <br /> <br />12,500 <br /> <br />52 <br />