<br />SUMMARY SHEETS (Continued)
<br />
<br />IRRIGATION SERVICE AREAS (acres)
<br />
<br /> Colorado New Mexico Total
<br />Full service land
<br />Non-Indian 30,310 4,530 34,840
<br />Indian 13,400 380 13,780
<br />Subtotal 43,710 4,910 48,620
<br />Supplemental service land -- -
<br />Non-Indian 17, 300 3,720 21,020
<br />rnd ian 460 460
<br />Subtotal 17,760 3,720 21,480
<br />Total 61,470 8,630 70, 106'
<br />
<br />ESTIMATED COSTS
<br />
<br />Construction costs (January 1978 prices)
<br />Ridges Basin Dam and Reservoir
<br />Southern Ute Dam and Reservoir
<br />La Plata Diversion Dam
<br />Southern Ute Diversion Dam and Southern Ute
<br />Inlet Canal
<br />Durango Pumping Plant and Ridges Basin Inlet
<br />Conduit
<br />Ridges Basin Pumping Plant
<br />Sprinkler pumping plants
<br />Dry Side Canal and Long Hollow Tunnel
<br />New Mexico Irrigation Canal
<br />Durango Municipal and Industrial Pipeline
<br />Laterals
<br />Drains
<br />Transmission lines and substations
<br />Permanent operating facilities
<br />Operation and maintenance housing
<br />Recreational facilities
<br />Wildlife land
<br />Cultural resources programl/
<br />Operation and maintenance of future year
<br />capacity
<br />Total
<br />
<br />$51,000,000
<br />24,000,000
<br />1,300,000
<br />
<br />7,300,000
<br />
<br />39,500,000
<br />30,000,000
<br />12,300,000
<br />54,000,000
<br />2,000,000
<br />1,250,000
<br />80,990,000
<br />5,140,000
<br />8,640,000
<br />4,200,000
<br />130,000
<br />6,000,000
<br />4,600,000
<br />3,000,000
<br />
<br />1,000,000
<br />336,350,000
<br />
<br />Annual operation, maintenance. and replacem~nt
<br />costs (1974-76 prices)
<br />1/ The project authorization limits this amount to no
<br />1 percent of the total project cost. The Bureau is seeking
<br />authorization to exceed this amount.
<br />
<br />2,137,000
<br />more than
<br />Congressional
<br />
<br />4
<br />
|