My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06093
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:14 PM
Creation date
10/12/2006 1:25:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543.200
Description
Projects in the Closed Basin
State
CO
Basin
Rio Grande
Water Division
3
Date
3/1/1989
Title
Closed Basin Division Operating Criteria
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The conveyance channel discharges into the Rio Grande below the existing <br /> <br /> <br />New Ditch diversion dam. A gated check structure prevents high flows in the <br /> <br />Rio Grande from backing up into the channel. <br /> <br />D. Observation Wells <br /> <br />A network of 82 observation wells provides water level or pressure data for <br /> <br />both the confined and unconfined aquifers. These data will be used to operate <br /> <br />the project within the limits prescribed by the authorizing legislation. <br /> <br />Some of the observation wells are "dual-completion" wells, that is, one <br /> <br />4-inCll diameter well in the confined or artesian aquifer and another in the <br /> <br />unconfined aquifer. The remaining observation wells individually monitor the <br /> <br /> <br />confined or unconfined aquifers. Enclosures of corrugated metal pipe provide <br /> <br />well head protection and space for the solar-powered monitoring and com- <br />munications equipment. Dual completion wells are housed in a common well head <br />enclosure. <br /> <br />The remaining observation wells individually monitor the confined or uncon- <br />fined aquifers. Construction of tne monitoring system at these sites includes <br />the installation of enclosures for the protection of the monitoring and com- <br /> <br />munications equipment. <br /> <br />E. Programmable Master Supervisory Control System (PMSCl <br /> <br />During the early stages of project development, the complexities and dif- <br /> <br /> <br />ficulty of manually operating the Closed Basin water conveyance system became <br /> <br />apparent. Maintaining the required water quality at the point of delivery, <br /> <br />regulating water deliveries, detecting equipment problems, obtaining and storing <br /> <br /> <br />operational data, and operating the water delivery system in a cost efficient <br /> <br />7 <br /> <br />r, .... f"" .;: ~ ,-." <br />r-..,.... ......'.ivJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.