Laserfiche WebLink
<br />1822 <br /> <br /> Table 7.2 Renter Requirement for 5,000 af Water Bank <br /> Monthly User Transit Transit FLC HG FLC HG <br /> Distribution Demand Loss 1 Loss 1 Requirement Requirement <br /> (%) (at) (%) (at) (at) (cfs) <br />March > 15 4.4 219 0.54 1.2 220 7 <br />April 8,2 411 0.54 2,2 413 7 <br />May 8.5 425 0.54 2.3 427 7 <br />June 8.2 411 0.54 2,2 413 7 <br />July 8.5 425 0.54 2.3 427 7 <br />August 8.5 425 0.54 2.3 427 7 <br />September 8.2 411 0.54 2.2 413 7 <br />October 8.5 425 0.54 2,3 427 7 <br />Nov < == 15 4,1 205 0.54 1.1 207 7 <br />Nov > 15 4.1 205 0,54 1.1 207 7 <br />December 8,5 425 0.54 2.3 427 7 <br />January 8.5 425 0.54 2.3 427 7 <br />, <br />February 7.7 384 0.54 2.1 386 7 <br />Mar < == 15 4.1 205 0.54 1.1 207 7 <br />Total 100.0 5,000 27 5,027 <br /> <br />Notes: <br />Computed to renter's point of diversion from the main headgate. The transit loss is variable, <br />dependent upon the antecedent flow in the river and other conditions at the time of release and <br />delivery. <br /> <br />7-17 <br /> <br />" <br />