Laserfiche WebLink
<br />ti1453 <br /> <br />western states has yet to contacted about this situation. To mitigate this problem <br />Western could have to build a redundant microwave path from Loveland to Colorado <br />Springs thereby connecting with the southern CRSP microwave system. The cost of <br />this path was estimated at $4.0 to $5.0 million dollars. Most likely WAPA would <br />charge the facilities to CRSP. This would require a NEPA because WAPA is causing <br />something to be build because of its "Will Be" plan. <br /> <br />II <br />